(Created page with "PARTICIPANTS: Carlos, Fernando, Thi, Emmanuel, Vladimir, Tanja, Brad DISCUSSION GROUND BETWEEN PCB AND ALUMINUM PART * Option to connect PCB+aluminum part * Enclosure alrea...")
 
 
Line 11: Line 11:
 
* Can put provision on PCB board for additional grounding - activating this feature would take some labor though (unplug, activate, reinstall, etc.)
 
* Can put provision on PCB board for additional grounding - activating this feature would take some labor though (unplug, activate, reinstall, etc.)
  
* Review overview sketch of grounding (Fernando)
+
* Review [https://wiki.jlab.org/cuawiki/images/7/76/NPS-special-meeting-grounding-15Oct2021.png overview sketch of NPS grounding] (Fernando)
 
::* general agreement that it captures all features of NPS grounding
 
::* general agreement that it captures all features of NPS grounding
 
::* next: put sketch into CAD for more detailed discussion
 
::* next: put sketch into CAD for more detailed discussion

Latest revision as of 17:42, 18 October 2021

PARTICIPANTS: Carlos, Fernando, Thi, Emmanuel, Vladimir, Tanja, Brad

DISCUSSION GROUND BETWEEN PCB AND ALUMINUM PART

  • Option to connect PCB+aluminum part
  • Enclosure already grounded through mechanical attachment to structure - cannot isolate detector from support structure
  • mu metal shield already connected to mechanical structure
  • make sure that shielding ground (through mechanical structure) is separate from electronics ground
  • Can put provision on PCB board for additional grounding - activating this feature would take some labor though (unplug, activate, reinstall, etc.)
  • general agreement that it captures all features of NPS grounding
  • next: put sketch into CAD for more detailed discussion
  • Main NPS box isolated from carriage
  • How to test grounding scheme
  • can do some tests in the lab - some simulations possible
  • ultimately will have to test when all is assembled
  • Need information on position of connector on PCB
  • Action items:
  • generate CAD for NPS grounding
  • finalize design of PCB - need position of connector
  • test optimized divider (Vladimir)
  • Estimated timeline:
  • finalize PCB design
  • prototype new PCB and testing
  • production - should be in place by end of the year