Difference between revisions of "Meeting-06232022"

From Cuawiki
Jump to navigation Jump to search
Line 23: Line 23:
 
* Near-term priorities (for summer tests)
 
* Near-term priorities (for summer tests)
 
** hcana FADC mode 10 code (Mark, David) -- DONE
 
** hcana FADC mode 10 code (Mark, David) -- DONE
** hcana replay script and database file (David)  
+
** hcana NPS class, replay script and database file (David)  
 
** online display and cosmic calibration scripts (Julie, Pramita, Alexandre, Zheng)
 
** online display and cosmic calibration scripts (Julie, Pramita, Alexandre, Zheng)
** code to handle VTP data in hcana (David)
+
** code to handle VTP data in hcana (David) -- should meet with Ben
 +
 
 +
* Medium-term (summer - fall)
 +
** data unblocking (David, ??) -- will set up a meeting with Bryan M early July
 +
** geant4 simulation -- what exists already, could use g4sbs framework (Marie, Deb)
 +
** online interface with ET system (Paul)
  
 
* Longer term
 
* Longer term
 +
** offline reconstruction and clustering (Steve, Carlos Y, ??)
 
** offline calibration scripts (??)
 
** offline calibration scripts (??)
** online interface with ET system (David, ??)
 
** data unblocking in hcana (David, ??)
 
** offline reconstruction and clustering (Steve, Carlos Y)
 
** multi-threading in hcana (David, ??)
 
** geant4 simulation -- what exists already, could use g4sbs framework (David, ??)
 
** anything else?
 

Revision as of 05:45, 24 June 2022

Mailing lists

If you are not already subscribed please sign up to nps and nps_daq at:

https://mailman.jlab.org/mailman/listinfo/nps
https://mailman.jlab.org/mailman/listinfo/nps_daq

Zoom link

https://jlab-org.zoomgov.com/j/16162588644?pwd=eklwZko1TDZkam1Ba3dSYVkyVlk4dz09

Agenda

  • DAQ and firmware
  • Slow controls
  • Software (see below)
  • Other business

Software task list (draft)

  • Near-term priorities (for summer tests)
    • hcana FADC mode 10 code (Mark, David) -- DONE
    • hcana NPS class, replay script and database file (David)
    • online display and cosmic calibration scripts (Julie, Pramita, Alexandre, Zheng)
    • code to handle VTP data in hcana (David) -- should meet with Ben
  • Medium-term (summer - fall)
    • data unblocking (David, ??) -- will set up a meeting with Bryan M early July
    • geant4 simulation -- what exists already, could use g4sbs framework (Marie, Deb)
    • online interface with ET system (Paul)
  • Longer term
    • offline reconstruction and clustering (Steve, Carlos Y, ??)
    • offline calibration scripts (??)