Difference between revisions of "General Meeting Agenda 6/30/22"

From Cuawiki
Jump to navigation Jump to search
(Created page with "DISCUSSION ITEMS * Update on VTP firmware (Brad, Ben) * Updates from subsystems * Assembly activities (Carlos, et al.) ::* Frame assembly, crystal stacking, etc. ::* Prepar...")
 
 
Line 6: Line 6:
  
 
* Assembly activities (Carlos, et al.)
 
* Assembly activities (Carlos, et al.)
::* Frame assembly, crystal stacking, etc.
+
::* Frame assembly, crystal stacking, etc. : [https://wiki.jlab.org/cuawiki/images/6/67/NPS_update.pptx .pptx ] [https://wiki.jlab.org/cuawiki/images/8/84/NPS_update.pdf .pdf]
 
::* Preparations for detector checkout (cables, power supplies, etc.)
 
::* Preparations for detector checkout (cables, power supplies, etc.)
 
::* ...
 
::* ...

Latest revision as of 15:44, 1 July 2022

DISCUSSION ITEMS

  • Update on VTP firmware (Brad, Ben)
  • Updates from subsystems
  • Assembly activities (Carlos, et al.)
  • Frame assembly, crystal stacking, etc. : .pptx .pdf
  • Preparations for detector checkout (cables, power supplies, etc.)
  • ...
  • Detector checkout - update from DAQ/Electronics and Analyzer (David H., et al.)
  • Other