Difference between revisions of "General Meeting Agenda 9/10/15"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
*** Future DAQ development : developping high speed readout using VTP and cluster readout | *** Future DAQ development : developping high speed readout using VTP and cluster readout | ||
*** Try high rate source run to generate pile-up events | *** Try high rate source run to generate pile-up events | ||
+ | *** Using SBS HCAL and Hall A FADC, do we want a dedicated NPS FADC crate at some point ? | ||
* [https://wiki.jlab.org/cuawiki/images/7/76/Pbwo-2014-2016-1.pdf PWO tests, quality assurance, and specifications (Hamlet)] | * [https://wiki.jlab.org/cuawiki/images/7/76/Pbwo-2014-2016-1.pdf PWO tests, quality assurance, and specifications (Hamlet)] | ||
* Other... | * Other... |
Revision as of 03:05, 10 September 2015
ITEMS FOR DISCUSSION:
- Magnet follow-up
-
- README instructions for using the code (Gabi)
-
- Readout
- Status
- Finished HCAL FADC readout HPS firmware : 256 channels
- Cosmics trigger setup
- Ran at 150 Hz pulser max
- Cosmics run 22 and 29
- Status
- Plan
- Setup DVCS ARS to have 1 GHz sampling
- Develop trigger clustering
- Future DAQ development : developping high speed readout using VTP and cluster readout
- Try high rate source run to generate pile-up events
- Using SBS HCAL and Hall A FADC, do we want a dedicated NPS FADC crate at some point ?
- Plan
- PWO tests, quality assurance, and specifications (Hamlet)
- Other...