Meeting-06232022
Mailing lists
If you are not already subscribed please sign up to nps and nps_daq at:
Zoom link
https://jlab-org.zoomgov.com/j/16162588644?pwd=eklwZko1TDZkam1Ba3dSYVkyVlk4dz09
Agenda
- DAQ and firmware
- Slow controls
- Software (see below)
- Other business
Software task list (draft)
- Near-term priorities (for summer tests)
- hcana FADC mode 10 code (Mark, David) -- DONE
- hcana NPS class, replay script and database file (David)
- online display and cosmic calibration scripts (Julie, Pramita, Alexandre, Zheng)
- code to handle VTP data in hcana (David) -- should meet with Ben
- Medium-term (summer - fall)
- data unblocking (David, ??) -- will set up a meeting with Bryan M early July
- geant4 simulation -- what exists already, could use g4sbs framework (Marie, Deb)
- online interface with ET system (Paul)
- Longer term
- offline reconstruction and clustering (Steve, Carlos Y, ??)
- offline calibration scripts (??)