HOMEWORK
- Edits of section II and III (Donal/Dustin)
- Simulation for thinner shielding and corresponding increase in radiation (Jixie)
- Check details and edit section VI (Bogdan/Rolf)
- General editing and section I (Tanja, David, Thia)
Discussion about "10-page" document DRAFT 5/8/2018
- Edits in this draft:
- first page with authors
- line numbers
- increased figure sizes
- updated text from Bogdan for sections III and VI
- updated figures 19/20 from Jixie
- a new, additional figure 22 (p.24) from Jixie that may be of interest in the Engineering&Safety section (VI)
- updated Appendix 1
- an additional figure 25 (p. 27) in Appendix 1
- updated bibliography
- Discussion of these edits and any additional ones needed
- Section I needs updating
- Section III discussion
- page 2: line wrapping
- page 7: edit red paragraph to convey succinctly that "desired spot size is 1mm and that this design can deliver this and hat 2mm would be fine in principle"
- page 9: remove the red paragraph here, but include information about target motion in earlier section, e.g. different conditions from electron beam and address these with an effectively rastered photon beam; also include an overview of sections and connections between them in Section I
- Section VI
- globally requires revisions to better match the design presented here, e.g. pre-assembly and installation
- page 22 list - add numbers
- Discussion about girder and possible changed needed - Bogdan and Rolf will go to Hall C and take a look in person
- Discussion about cost estimate - ~$3M based on concept with W powder
- Check if all numbers in table correct and recent
- Check if material thickness can be reduced and what the resulting increase in radiation would be, e.g. shave off 5 cm from sides and 5 cm from back and 10 cm from front and redo calculations with FLUKA
NEXT MEETING: TUESDAY 22 MAY AT 3:00PM (EDT)