Special Meeting Grounding Scheme Summary 9/22/21
Jump to navigation
Jump to search
PARTICIPANTS: Carlos, Fernando, Thi, Emmanuel, Vladimir, Tanja, Brad
DISCUSSION GROUND BETWEEN PCB AND ALUMINUM PART
- Option to connect PCB+aluminum part
- Enclosure already grounded through mechanical attachment to structure - cannot isolate detector from support structure
- mu metal shield already connected to mechanical structure
- make sure that shielding ground (through mechanical structure) is separate from electronics ground
- Can put provision on PCB board for additional grounding - activating this feature would take some labor though (unplug, activate, reinstall, etc.)
- Review overview sketch of grounding (Fernando)
- general agreement that it captures all features of NPS grounding
- next: put sketch into CAD for more detailed discussion
- Main NPS box isolated from carriage
- How to test grounding scheme
- can do some tests in the lab - some simulations possible
- ultimately will have to test when all is assembled
- Need information on position of connector on PCB
- Action items:
- generate CAD for NPS grounding
- finalize design of PCB - need position of connector
- test optimized divider (Vladimir)
- Estimated timeline:
- finalize PCB design
- prototype new PCB and testing
- production - should be in place by end of the year