Meeting-05052022
Jump to navigation
Jump to search
Agenda
- DAQ and firmware
- Slow controls
- Decoding software (FADC mode10, VTP data, unblocking)
- Online software (raw displays, gui, interface with ET system)
- Offline reconstruction (clustering algorithm, multi-threading)
- Other business
DAQ and slow control update (Brad)
- Move to EEL 108 delayed but all hardware needed (cdaql3, monitor, etc) is in hand.
- Slow controls are in good shape (Brad met with Aaron) including HV, chiller and thermal readback.
- Still a bit of work needed on the LED board GUI but we can control from the terminal during initial tests.
Online software update (Julie)
- Julie and Pramita working on analysing SHMS PionLT mode10 data.
- There was a question about the timeline for "first interesting data". Brad suggested it would probably be mid-June at the earliest.