General EEEMCal Meeting Summary 9/20/24
Jump to navigation
Jump to search
Back to Meeting Main Page --> Meeting Main
PARTICIPANTS: Carlos, Richard, Philip, Rosi, Douglas, Irina, Hamlet, Tanja, Patrick Moran, Ioana, Vardan, Ethan Cline, Renee, Sasha, Gerard, Holly, Josh, Julie, Julien Bettane, Justin,
PROTOTYPE PREPARATIONS
- IJCLab-Orsay prototype
- received first board from vendor (SiPMs positioning in array look good) and testing - will send out order for all 25 board soon
- working on procedure for reading out the ASIC boards
- have capability for the daughter boards for the fADC discrete readout
- overall on track for the beam test
- Work at OU towards fADC discrete readout with IJCLab-Orsay prototype
- Larry is working on the preamp/daughter boards
- Borrowed CAEN V1725 and CAEN VME interface/controller for development to explore the "discrete" readout locally at OU. Note: for the DESY beam test will use the MIT CAEN V1725 modules
- timeline right but expect to be ready
- Work at ACU/CUA/JLab towards the SiPM module assembly for the 2-channel MIT prototype direct PMT/SiPM comparison
- Larry completed and sent the SiPM assemblies to JLab
- Josh has been working on assembling them with crystals and plans to test the full module in the dark box soon
- Detailed run plan draft is being prepared
- currently Carlos is editing
- expect to circulate the next version sometime next week
- Meeting on online data analysis on Friday (9/20)
- Ethan shared GitHub repo for v1725 digitizer readout and analysis code with some of us. More contributors welcome!
- MIT shipment is being packed up and Carnet has been completed for one year - components will stay at DESY for one year
- will also include QCD
- will also include 100ft cables that could be used for, e.g., attenuation tests
- Personnel logistics - there are a few people that need to complete the registration
- two from Orsay
- two from OU
- one from AANL
NSF MSRI PROPOSAL
- Due date to CUA SPO: 4 November 2024
- Pre-proposal has been created in Research.gov
- many people have been added, but need to add a few more
- Documentation needed:
- Narrative
- Project
- Budget
- Supplementary
- Narrative does not need a complete re-write, but requires alignment with any changes in the 2024 solicitation and may also benefit from some wording optimizations
- Action: need to check alignment of Broader Impacts section with the 2024 soliciation
- Examples of wording optimizations:
- timeline of the consortium that underlines a well organized group, active group, and ready to start the construction
- additional clarifications of signal/DAQ, e.g., where scope of EEEMCAL project ends
- Budget is a key piece of the submission - needs checking over by all subsystems for accuracy
- Action: all subsystems need to check and update the numbers as needed following the procedure below
- Procedure for updating the budget
- budget subsystem coordinator collects the information and modifies the spreadsheet
- budget subsystem coordinator sends the modified spreadsheet to Ioana and Tanja
- Budget and subsystem coordinators
- Radiator: Ioana
- Photosensor: Justin
- Mechanical: Richard/Jim
- Signal/DAQ: Holly
- Software/Simulations: Cristiano
- Project (PEP): Julie
- While quotes are not allowed in the preproposal submission, it is a good idea to check on the large ticket items
ADDITIONAL LOGISTICS DISCUSSIONS WITH NSF
- The contacts for MPS/PHY are: Camillo Mariani and Slava Lukin. If there are any specific logistics questions of the competition we should contact them and copy Allena/Vicki
NEXT GENERAL MEETING: FRIDAY 4 OCTOBER AT 8:00AM ET