General Meeting Summary 1/4/18

From Cuawiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

SUBSYSTEM UPDATES

MAGNET (Bogdan)

  • Magnet main coil on the way from New Zealand - anticipated arrival at end of January
  • Magnet yoke on schedule for delivery end of January or beginning of February
  • Many parts are finished and will be going for painting. Still have to finish machine a few items, mostly the parts from the sawed plates. They are all ground and are not expected to take long to machine. A few of the rough machined items are out for heat treat. The painting is delayed because of the extreme cold right now.
  • Pictures of the yoke parts: Pic1, Pic2, Pic3
  • same dimensions, just in a different location


HV DIVIDERS (Julie)

  • Order was placed for 1200 dividers, anticipate 30 day delivery, assembly of a few hundred could be done by summer
  • Need sockets for full assembly
  • currently have ~200 PMTs and sockets at JLab (some have been machined from larger size, but all should be ok)
  • option to procure all sockets this year to finalize full assemblies by next year fall


FRAME (Carlos)

  • Planning to present design options at the collaboration meeting and to discuss possible optimizations. IPNO engineer/designer will also meet with Mike Fowler.


CRYSTALS (Carlos, Rong, Vladimir, TH)

  • Granite table ready for dimension measurements at JLab
  • IPNO setting up for crystal characterization measurements, carried out tests at Giessen U. for inter-laboratory comparison - data analysis ongoing
  • Microscopy and chemical composition analysis were carried out for 12 crystals at CUA.
  • chemical composition determined with XRF, statistical analysis suggests that both, stoichiometry and addition of other elements have an impact on optical properties, more detailed analysis ongoing
  • Optical measurements continuing at CUA


PMTs (Vladimir, A. Somov)

  • PMT characterization setup at JLab - fixed light leaks of dark box in the process
  • 65 PMTs were tested, all with the same divider
  • HV scan, measured amplitudes - looks good at first glance
  • HV scan at fixed amplitude
  • Planning to write report on all measurements and post in Wiki


TIMELIKE COMPTON SCATTERING WITH TRANSVERSE TARGET AND RUN GROUP IDEAS

  • Discussion of analytical TCS rate estimate with CPS based on Jan2017 simulations with NPS only
  • Looks promising and competitive with other experiments - need to check rates in more detail now
  • Discussion of SSA in quasi-real photon production off transverse target
  • Discussion of tests of reaction mechanism in exclusive pion production
  • Action Item: Try to work out count estimate with NPS+CPS setup and what asymmetry can actually be achieved. Can keep the same generator for that


NEXT MEETING: TUESDAY 23 JANUARY 2018 AT JLAB