* Design models, stress/thermal calculations
 
* Design models, stress/thermal calculations
  
* Engineering analysis and planning
+
* Engineering analysis and planning [https://wiki.jlab.org/cuawiki/images/1/19/Status-Jan-14-2022.pptx Status Update]
  
 
* TCS updates
 
* TCS updates
Line 11: Line 11:
  
 
* J/psi transverse asymmetries near threshold
 
* J/psi transverse asymmetries near threshold
Marie Boër, Erik Wrightson: our goals / Erik's update
+
Marie Boër, Erik Wrightson:  
 +
[https://wiki.jlab.org/cuawiki/index.php/File:CPS_14jan2022_mboer.pdf physics goals and Erik's work update]
 +
 
 +
 
 +
PARTICPANTS: Steven L., Bogdan, Rolf, Amy, Brannon, Hamlet, Hovanes, Marie, Tanja, David H.
 +
 
 +
 
 +
'''MECHANICAL DESIGN/ENGINEERING
 +
'''
 +
* Coil discussions with potential vendor - preparing material for review
 +
::* pancake option vs. continous wound option (less splices/joints) - both are within regime of existing power supplies - need to revisit if/which existing power supply to use
 +
::* cooling system options - closed/contained circuit vs. open - need to check with Radcon on requirements for 1-10kW dumps around beamline
 +
 
 +
* Action items:
 +
::* radiation of LCW
 +
::* voltage of power supply
 +
::* extend flanges outside shielding
 +
 
 +
* Design work started on CPS/shielding platform
 +
 
 +
* 44 80W20Cu (alloy WCu) blocks moved to Physics storage and one crate opened for inspection
 +
 
 +
 
 +
'''UPDATES TCS'''
 +
 
 +
* Discussion
 +
 
 +
'''NEXT MEETING: FRIDAY 11 FEBRUARY AT 8AM ET'''

Latest revision as of 12:20, 15 January 2022

DISCUSSION ITEMS

  • Design models, stress/thermal calculations
  • TCS updates

Brannon Semp (VT): TCS double spin asymmetries TCS updates on BTSA

  • Other
  • J/psi transverse asymmetries near threshold

Marie Boër, Erik Wrightson: physics goals and Erik's work update


PARTICPANTS: Steven L., Bogdan, Rolf, Amy, Brannon, Hamlet, Hovanes, Marie, Tanja, David H.


MECHANICAL DESIGN/ENGINEERING

  • Coil discussions with potential vendor - preparing material for review
  • pancake option vs. continous wound option (less splices/joints) - both are within regime of existing power supplies - need to revisit if/which existing power supply to use
  • cooling system options - closed/contained circuit vs. open - need to check with Radcon on requirements for 1-10kW dumps around beamline
  • Action items:
  • radiation of LCW
  • voltage of power supply
  • extend flanges outside shielding
  • Design work started on CPS/shielding platform
  • 44 80W20Cu (alloy WCu) blocks moved to Physics storage and one crate opened for inspection


UPDATES TCS

  • Discussion

NEXT MEETING: FRIDAY 11 FEBRUARY AT 8AM ET