Meeting 21 February 2020

From Cuawiki
Revision as of 18:25, 24 February 2020 by Hornt (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

DISCUSSION MATERIAL

  • Update from CPS beamline meeting
  • Update from KLong and GlueX collaboration meetings


ACTION ITEMS

  • Remind Radcon about sending numbers
  • CPS radiation simulations: additional tests to finalize CPS optimized geometry (see emails)
  • Hall D - prepare a sketch model of magnet
  • TCS: for Q2=5 GeV2 want reliable extraction of CFF and show that one can have a good measurement in Hall A/C


SUMMARY NOTES

RADIATION SIMULATION

  • discussion of a number of different simulations carried out to optimize cost, material, dimensions - done in two ways: 1) geometry, material, layering, and 2) pure material
  • If replace all tungsten with lead, then prompt radiation significantly worse, but activation levels still looks good
  • Replacing tungsten by lead in the backward region has reasonable prompt and activation levels depending on how much lead is used - lead below z=0 seems a good compromise
  • Having a lead "frame" outside (2.5 cm top, 5cm bottom) helps to reduce radiation levels even further