+ | PARTICIPANTS: A. Comer, A. Asaturyan, B. Wojtsekhowski, H. Mkrtchyan, B. Metzger, P. Stepanov, R. Ent. V. Tadevosyan, T. Horn, D. Day, M. Boer | ||
+ | |||
+ | '''CPS THERMAL MODELING''' (Amy) | ||
+ | |||
+ | * Heat applied: 30kW total divided over 58 blocks of volume 29.1 mm3 --> per block 517 W/2.91 m2 = 1.78*10^10 W/m3 | ||
+ | |||
+ | * Analysis of temperature profile and pressure drop | ||
+ | ::* max temperature: 615 degC | ||
+ | |||
+ | * Model is working! | ||
+ | |||
+ | * '''Action''': | ||
+ | ::* adjust to a more realistic power distribution (equally distribute over full length, max shifted towards the middle) | ||
+ | ::* update length (note: magnet length was extended slightly) | ||
+ | |||
+ | |||
+ | '''CPS SHIELDING LAYOUT MODEL''' (Bert) | ||
+ | |||
+ | * Discussion of design magnet for case where lifted into position vs. installed in place | ||
+ | |||
+ | * Shielding configuration around the channel | ||
+ | |||
+ | * '''Actions''': | ||
+ | ::* With large weight installed, how to check that magnet does not move? | ||
+ | ::* how to stack, e.g., around the channel (transporting photons)? | ||
+ | |||
+ | |||
+ | '''NEXT MEETING: FRIDAY 12 NOVEMEBER AT 8AM ET''' |
Latest revision as of 17:38, 24 October 2021
DISCUSSION ITEMS
- Thermal Modeling
- Shielding Layout model
- TCS updates
- Other
PARTICIPANTS: A. Comer, A. Asaturyan, B. Wojtsekhowski, H. Mkrtchyan, B. Metzger, P. Stepanov, R. Ent. V. Tadevosyan, T. Horn, D. Day, M. Boer
CPS THERMAL MODELING (Amy)
- Heat applied: 30kW total divided over 58 blocks of volume 29.1 mm3 --> per block 517 W/2.91 m2 = 1.78*10^10 W/m3
- Analysis of temperature profile and pressure drop
- max temperature: 615 degC
- Model is working!
- Action:
- adjust to a more realistic power distribution (equally distribute over full length, max shifted towards the middle)
- update length (note: magnet length was extended slightly)
CPS SHIELDING LAYOUT MODEL (Bert)
- Discussion of design magnet for case where lifted into position vs. installed in place
- Shielding configuration around the channel
- Actions:
- With large weight installed, how to check that magnet does not move?
- how to stack, e.g., around the channel (transporting photons)?