Difference between revisions of "EJFAT Group Meeting Feb. 03, 2022"

From epsciwiki
Jump to navigation Jump to search
(Created page with " The meeting time is 11:00am. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://jlab-org.zoomgov.com/j/1610125238?p...")
 
 
(One intermediate revision by the same user not shown)
Line 32: Line 32:
 
<!-------------------------------------------------------------------------------------------------->
 
<!-------------------------------------------------------------------------------------------------->
 
=== Agenda: ===
 
=== Agenda: ===
# [[EJFAT Group Meeting Jan. 20, 2022 | Previous meeting]]
+
# <s>[[EJFAT Group Meeting Jan. 27, 2022 | Previous meeting]]</s>
 
#:
 
#:
 
#:
 
#:
Line 46: Line 46:
 
# Configuration of network switches and Host CPU for FPGA LB (Bryan)
 
# Configuration of network switches and Host CPU for FPGA LB (Bryan)
 
# POs for Compute/Networking submitted - ETA 1 June
 
# POs for Compute/Networking submitted - ETA 1 June
 +
# Test Lab build out
 
#:
 
#:
 
# AOT
 
# AOT

Latest revision as of 13:33, 3 February 2022

The meeting time is 11:00am.

Connection Info:

You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):

Meeting URL
 https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon

Meeting ID
161 012 5238

Passcode
503371

Want to dial in from a phone?

Dial one of the following numbers:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)

Enter the meeting ID and passcode followed by #

Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode

Agenda:

  1. Previous meeting
  2. S/W development activities
    • ERSAP
    • Simulation suite
    • Emulation suite
    • LB Firmware
    • Support stack for LB Host Control Plane (ESnet)
    • LB Control Plane
    • Test Plans
  3. ESnet code / EJFAT GitHub (private) repository
  4. Configuration of network switches and Host CPU for FPGA LB (Bryan)
  5. POs for Compute/Networking submitted - ETA 1 June
  6. Test Lab build out
  7. AOT



Minutes:

Attendees: