Line 43: | Line 43: | ||
#* PO for Compute submitted - ETA 1 June | #* PO for Compute submitted - ETA 1 June | ||
#* PO for Networking submitted - ETA 1 July | #* PO for Networking submitted - ETA 1 July | ||
− | + | * [[Test Plans | Test Plan]] | |
− | |||
− | |||
− | |||
− | |||
− | * [[Test Plans]] | ||
# Needs: | # Needs: | ||
#* Test Lab build out | #* Test Lab build out | ||
− | #* Scrounge compute hosts | + | #** Use FPGA port #1 for local host subnet testing |
− | #* Plumbing networking to spaces (ETA: week of 02/13/2022) | + | #** Use FPGA port #2 for switch fabric testing |
− | #* Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?) | + | #** Using (2) spare/borrowed switches in DAQ data center/lab |
+ | #** Scrounge compute hosts | ||
+ | #** Plumbing networking to spaces (ETA: week of 02/13/2022) | ||
+ | #** Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?) | ||
+ | #* Control Plane | ||
+ | #** Arp cache poisoning | ||
+ | #** Control must handle arp messages | ||
#: | #: | ||
# AOT | # AOT |
Revision as of 19:41, 15 February 2022
The meeting time is 11:00am.
Connection Info:
You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon Meeting ID 161 012 5238 Passcode 503371 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Situation:
- End-to-end EJFAT ERSAP solution underway
- New FPGA f/w being tested
- Minor f/w change for 'garbage' packets pending
- Support stack for LB Host Control Plane underway (ESnet)
- LB Control Plane - on hold
- PO for Compute submitted - ETA 1 June
- PO for Networking submitted - ETA 1 July
- Needs:
- Test Lab build out
- Use FPGA port #1 for local host subnet testing
- Use FPGA port #2 for switch fabric testing
- Using (2) spare/borrowed switches in DAQ data center/lab
- Scrounge compute hosts
- Plumbing networking to spaces (ETA: week of 02/13/2022)
- Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?)
- Control Plane
- Arp cache poisoning
- Control must handle arp messages
- Test Lab build out
- AOT