Line 43: Line 43:
 
#* PO for Compute submitted - ETA 1 June
 
#* PO for Compute submitted - ETA 1 June
 
#* PO for Networking submitted - ETA 1 July
 
#* PO for Networking submitted - ETA 1 July
#* Arp cache poisoning
+
* [[Test Plans | Test Plan]]
#* Control must handle arp messages
 
#* Use FPGA port #1 for local host subnet testing
 
#* Use FPGA port #2 for switch fabric testing
 
#* Using (2) spare/borrowed switches in DAQ data center/lab
 
* [[Test Plans]]
 
 
# Needs:
 
# Needs:
 
#* Test Lab build out
 
#* Test Lab build out
#* Scrounge compute hosts
+
#** Use FPGA port #1 for local host subnet testing
#* Plumbing networking to spaces (ETA: week of 02/13/2022)
+
#** Use FPGA port #2 for switch fabric testing
#* Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?)
+
#** Using (2) spare/borrowed switches in DAQ data center/lab
 +
#** Scrounge compute hosts
 +
#** Plumbing networking to spaces (ETA: week of 02/13/2022)
 +
#** Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?)
 +
#* Control Plane
 +
#** Arp cache poisoning
 +
#** Control must handle arp messages
 
#:
 
#:
 
# AOT
 
# AOT

Revision as of 19:41, 15 February 2022

The meeting time is 11:00am.

Connection Info:

You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):

Meeting URL
 https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon

Meeting ID
161 012 5238

Passcode
503371

Want to dial in from a phone?

Dial one of the following numbers:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)

Enter the meeting ID and passcode followed by #

Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode

Agenda:

  1. Previous meeting
  2. Situation:
    • End-to-end EJFAT ERSAP solution underway
    • New FPGA f/w being tested
    • Minor f/w change for 'garbage' packets pending
    • Support stack for LB Host Control Plane underway (ESnet)
    • LB Control Plane - on hold
    • PO for Compute submitted - ETA 1 June
    • PO for Networking submitted - ETA 1 July
  1. Needs:
    • Test Lab build out
      • Use FPGA port #1 for local host subnet testing
      • Use FPGA port #2 for switch fabric testing
      • Using (2) spare/borrowed switches in DAQ data center/lab
      • Scrounge compute hosts
      • Plumbing networking to spaces (ETA: week of 02/13/2022)
      • Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?)
    • Control Plane
      • Arp cache poisoning
      • Control must handle arp messages
  2. AOT



Minutes:

Attendees: