Line 37: Line 37:
 
* Situation:
 
* Situation:
 
** End-to-end EJFAT ERSAP solution underway
 
** End-to-end EJFAT ERSAP solution underway
** New FPGA f/w being tested
+
** Testing on FPGA LB
 
** Minor f/w change for 'garbage' packets pending
 
** Minor f/w change for 'garbage' packets pending
 
** Support stack for LB Host Control Plane underway (ESnet)
 
** Support stack for LB Host Control Plane underway (ESnet)
** LB Control Plane - on hold
+
** Using script based LB Control Plane
 
** PO for Compute submitted - ETA 1 June
 
** PO for Compute submitted - ETA 1 June
 
** PO for Networking submitted - ETA 1 July
 
** PO for Networking submitted - ETA 1 July

Revision as of 15:34, 16 February 2022

The meeting time is 2:00pm.

Connection Info:

You can connect using ZoomGov Video conferencing (ID: 161 203 8101). (Click "Expand" to the right for details -->):

Meeting URL
https://jlab-org.zoomgov.com/j/1612038101?pwd=Yk96QUcyT1NDVTRRUGNtOFVSSTdaUT09&from=addon

Meeting ID
161 203 8101

Passcode
378382

Want to dial in from a phone?

Dial one of the following numbers:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)

Enter the meeting ID and passcode followed by #

Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode

Agenda:

  • Previous meeting
  • Situation:
    • End-to-end EJFAT ERSAP solution underway
    • Testing on FPGA LB
    • Minor f/w change for 'garbage' packets pending
    • Support stack for LB Host Control Plane underway (ESnet)
    • Using script based LB Control Plane
    • PO for Compute submitted - ETA 1 June
    • PO for Networking submitted - ETA 1 July
    • EJFAT repo Cmake broken on daq-vdi ?
  • Test Plan
  • Issues:
    • Test Lab build out
      • Use FPGA port #1 for local host subnet testing
      • Use FPGA port #2 for switch fabric testing
      • Using (2) spare/borrowed switches in DAQ data center/lab
      • Scrounge compute hosts
      • Plumbing networking to spaces (ETA: week of 02/13/2022)
      • Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?)
    • Control Plane
      • Arp cache poisoning
      • Control must handle arp messages
  • AOT



Minutes:

Attendees: