Difference between revisions of "Cosmics test plans"

From epsciwiki
Jump to navigation Jump to search
Line 3: Line 3:
 
* Demonstrate that the CDC gain is stable
 
* Demonstrate that the CDC gain is stable
  
 +
Schedule:
 +
* 2022-02-25 Fri. - Test fully automated CDC HV control
 +
* 2022-03-01 Tue. - Start system
 +
* 2022-03-07 Tue. - Change configuration (left/right -> top/bottom)
 +
* 2022-03-14 Mon. - End test
  
 
Strategy:
 
Strategy:
Line 13: Line 18:
 
Needs:
 
Needs:
 
* AIEC software to read epics and wait for a stable period before calculating the gain and setting the HV
 
* AIEC software to read epics and wait for a stable period before calculating the gain and setting the HV
 +
** What determines "stable"?
 +
** Who?
 +
*:
 
* Method for scaling the HVB current to what it would be at the nominal HV before running the AI - will not be needed for cosmics but will be needed for CPP.
 
* Method for scaling the HVB current to what it would be at the nominal HV before running the AI - will not be needed for cosmics but will be needed for CPP.
 +
** Is this something that could be tested during cosmics run? (yes=implement, no=defer)
 +
*:
 
* Script to project dE/dx for 4-10 GeV tracks, fit it and calculate the gain factor
 
* Script to project dE/dx for 4-10 GeV tracks, fit it and calculate the gain factor
* Code to set whole quadrants to same value ([https://docs.google.com/presentation/d/1ehsJkJTZeg9_Go380I6I5YvK2ltBstLpqM2D-66BgIc/edit?usp=sharing cdc_tool.py])
+
** Is this for needed for cosmics? (monitoring?)
 +
*:
 +
* <s>Code to set whole quadrants to same value</s>([https://github.com/JeffersonLab/AIEC/blob/main/utilities/cdc_tool.py cdc_tool.py])
  
 
Questions:
 
Questions:
* Do we need to force a B field in the reconstruction sw (wait for Simon to answer)
+
* <s>Do we need to force a B field in the reconstruction sw (wait for Simon to answer)</s>
 
** ''Simon reported progress on straight track reconstruction (email to David and Naomi Feb. 24th)''
 
** ''Simon reported progress on straight track reconstruction (email to David and Naomi Feb. 24th)''
* Full DAQ or standalone DAQ?
+
* <s>Full DAQ or standalone DAQ?</s>
 
** ''Ask Sergey for configuration with only CDC, BCAL''
 
** ''Ask Sergey for configuration with only CDC, BCAL''
* When are we doing this?
+
* <s>When are we doing this?</s>
 
** ''March 1-14, 2022''
 
** ''March 1-14, 2022''

Revision as of 19:44, 17 February 2022

Objectives:

  • Test drive the AIEC software
  • Demonstrate that the CDC gain is stable

Schedule:

  • 2022-02-25 Fri. - Test fully automated CDC HV control
  • 2022-03-01 Tue. - Start system
  • 2022-03-07 Tue. - Change configuration (left/right -> top/bottom)
  • 2022-03-14 Mon. - End test

Strategy:

  • Designate 2130V as the nominal HV for cosmics, to raise more hits above the noise, but keep 20V headroom for the AI.
  • Tell the AI that the HVB current is constant at 9uA so that it can operate within the range of its trained data
  • Use 1V steps and 1h runs
    • Starting new run every hour for 2 weeks may not be feasible. Devise scheme to break up long runs?


Needs:

  • AIEC software to read epics and wait for a stable period before calculating the gain and setting the HV
    • What determines "stable"?
    • Who?
  • Method for scaling the HVB current to what it would be at the nominal HV before running the AI - will not be needed for cosmics but will be needed for CPP.
    • Is this something that could be tested during cosmics run? (yes=implement, no=defer)
  • Script to project dE/dx for 4-10 GeV tracks, fit it and calculate the gain factor
    • Is this for needed for cosmics? (monitoring?)
  • Code to set whole quadrants to same value(cdc_tool.py)

Questions:

  • Do we need to force a B field in the reconstruction sw (wait for Simon to answer)
    • Simon reported progress on straight track reconstruction (email to David and Naomi Feb. 24th)
  • Full DAQ or standalone DAQ?
    • Ask Sergey for configuration with only CDC, BCAL
  • When are we doing this?
    • March 1-14, 2022