Difference between revisions of "EJFAT EPSCI Meeting Feb. 23, 2022"
Jump to navigation
Jump to search
Line 36: | Line 36: | ||
*: | *: | ||
* Situation: | * Situation: | ||
− | ** Testing on FPGA LB | + | ** Testing with ERSAP on FPGA LB |
** Using script based LB Control Plane | ** Using script based LB Control Plane | ||
** PO for Compute submitted - ETA 1 June | ** PO for Compute submitted - ETA 1 June | ||
Line 47: | Line 47: | ||
** ESnet private, forkable Jlab P4 and simulations GitHub repo (April) | ** ESnet private, forkable Jlab P4 and simulations GitHub repo (April) | ||
* To Do: | * To Do: | ||
− | ** Feedback | + | ** Feedback from Compute hosts design |
** Control Plane Arp cache poisoning | ** Control Plane Arp cache poisoning | ||
− | * | + | ** C-based control plane |
− | * | ||
** Test Lab build out | ** Test Lab build out | ||
*** Use FPGA port #1 for local host subnet testing | *** Use FPGA port #1 for local host subnet testing | ||
Line 58: | Line 57: | ||
*** <s>Plumbing networking to spaces</s>) | *** <s>Plumbing networking to spaces</s>) | ||
*** Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?) | *** Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?) | ||
− | *** [https://jeffersonlab-my.sharepoint.com/:b:/r/personal/goodrich_jlab_org/Documents/EJFAT/EJFAT%20Network%20Setup.pdf?csf=1&web=1&e=hkUo8k Diagram ] | + | *** [https://jeffersonlab-my.sharepoint.com/:b:/r/personal/goodrich_jlab_org/Documents/EJFAT/EJFAT%20Network%20Setup.pdf?csf=1&web=1&e=hkUo8k Diagram] |
+ | * [[Test Plans | Test Plan]] | ||
+ | * Issues: | ||
+ | ] | ||
*: | *: | ||
* AOT | * AOT |
Revision as of 13:23, 19 February 2022
The meeting time is 2:00pm.
Connection Info:
You can connect using ZoomGov Video conferencing (ID: 161 203 8101). (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1612038101?pwd=Yk96QUcyT1NDVTRRUGNtOFVSSTdaUT09&from=addon Meeting ID 161 203 8101 Passcode 378382 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Situation:
- Testing with ERSAP on FPGA LB
- Using script based LB Control Plane
- PO for Compute submitted - ETA 1 June
- PO for Networking submitted - ETA 1 July
- Pending:
- End-to-end EJFAT ERSAP solution
- Minor f/w change for 'garbage' packets
- Support C libraries for LB Host Control Plane
- ESnet smartnic open-source GitHub repo (April)
- ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
- To Do:
- Feedback from Compute hosts design
- Control Plane Arp cache poisoning
- C-based control plane
- Test Lab build out
- Use FPGA port #1 for local host subnet testing
- Use FPGA port #2 for switch fabric testing
- Use (2) spare/borrowed switches in DAQ data center/lab
Scrounge compute hostsPlumbing networking to spaces)- Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?)
- Diagram
- Test Plan
- Issues:
]
- AOT