Difference between revisions of "EJFAT EPSCI Meeting Feb. 23, 2022"

From epsciwiki
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 36: Line 36:
 
*:
 
*:
 
* Situation:
 
* Situation:
** Testing on FPGA LB
+
** Testing with ERSAP on FPGA LB
 
** Using script based LB Control Plane
 
** Using script based LB Control Plane
 
** PO for Compute submitted - ETA 1 June
 
** PO for Compute submitted - ETA 1 June
Line 46: Line 46:
 
** ESnet smartnic open-source GitHub repo (April)
 
** ESnet smartnic open-source GitHub repo (April)
 
** ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
 
** ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
* To Do:
 
** Feedback comms from Compute hosts design
 
** Control Plane Arp cache poisoning
 
* [[Test Plans | Test Plan]]
 
* Issues:
 
 
** Test Lab build out
 
** Test Lab build out
 
*** Use FPGA port #1 for local host subnet testing
 
*** Use FPGA port #1 for local host subnet testing
 
*** Use FPGA port #2 for switch fabric testing
 
*** Use FPGA port #2 for switch fabric testing
 
*** Use (2) spare/borrowed switches in DAQ data center/lab
 
*** Use (2) spare/borrowed switches in DAQ data center/lab
*** Scrounge compute hosts
+
*** <s>Scrounge compute hosts</s> Abbott supplying 8 rack mounted compute nodes
**** 129.57.29.*/24 -> 60+ hosts
+
*** Acquire (cheap) 8 x 10Gbs NICs for compute nodes ?  / Use existing NICs ?
**** 129.57.109.*/24 -> 7 hosts
+
*** <s>Plumbing networking to spaces</s>)
*** Plumbing networking to spaces (ETA: week of 02/21/2022)
 
 
*** Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?)
 
*** Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?)
 +
*** [https://jeffersonlab-my.sharepoint.com/:b:/r/personal/goodrich_jlab_org/Documents/EJFAT/EJFAT%20Network%20Setup.pdf?csf=1&web=1&e=hkUo8k Diagram]
 +
* To Do:
 +
** C-based control plane
 +
*** Feedback from Compute hosts design
 +
*** Control Plane Arp cache poisoning
 +
* [[Test Plans | Test Plan]]
 
*:
 
*:
 
* AOT
 
* AOT

Latest revision as of 19:03, 23 February 2022

The meeting time is 2:00pm.

Connection Info:

You can connect using ZoomGov Video conferencing (ID: 161 203 8101). (Click "Expand" to the right for details -->):

Meeting URL
https://jlab-org.zoomgov.com/j/1612038101?pwd=Yk96QUcyT1NDVTRRUGNtOFVSSTdaUT09&from=addon

Meeting ID
161 203 8101

Passcode
378382

Want to dial in from a phone?

Dial one of the following numbers:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)

Enter the meeting ID and passcode followed by #

Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode

Agenda:

  • Previous meeting
  • Situation:
    • Testing with ERSAP on FPGA LB
    • Using script based LB Control Plane
    • PO for Compute submitted - ETA 1 June
    • PO for Networking submitted - ETA 1 July
  • Pending:
    • End-to-end EJFAT ERSAP solution
    • Minor f/w change for 'garbage' packets
    • Support C libraries for LB Host Control Plane
    • ESnet smartnic open-source GitHub repo (April)
    • ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
    • Test Lab build out
      • Use FPGA port #1 for local host subnet testing
      • Use FPGA port #2 for switch fabric testing
      • Use (2) spare/borrowed switches in DAQ data center/lab
      • Scrounge compute hosts Abbott supplying 8 rack mounted compute nodes
      • Acquire (cheap) 8 x 10Gbs NICs for compute nodes ? / Use existing NICs ?
      • Plumbing networking to spaces)
      • Configuration of network switches and Host CPU for FPGA LB (ETA: week of ?)
      • Diagram
  • To Do:
    • C-based control plane
      • Feedback from Compute hosts design
      • Control Plane Arp cache poisoning
  • Test Plan
  • AOT



Minutes:

Attendees: