Difference between revisions of "EJFAT EPSCI Meeting Mar. 2, 2022"

From epsciwiki
Jump to navigation Jump to search
(Created page with "=== Agenda: === * Previous meeting *: *: * Situation: ** Testing with ERSAP on FPGA LB ** Using script based LB Control Plane ** PO for...")
 
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
The meeting time is 2:00pm.
 +
 +
=== Connection Info: ===
 +
<div class="toccolours mw-collapsible mw-collapsed">
 +
You can connect using [https://jlab-org.zoomgov.com/j/1612038101?pwd=Yk96QUcyT1NDVTRRUGNtOFVSSTdaUT09&from=addon ZoomGov Video conferencing (ID: 161 203 8101)]. <font size="-3">(Click "Expand" to the right for details -->):</font>
 +
 +
<div class="mw-collapsible-content">
 +
 +
Meeting URL
 +
https://jlab-org.zoomgov.com/j/1612038101?pwd=Yk96QUcyT1NDVTRRUGNtOFVSSTdaUT09&from=addon
 +
 +
Meeting ID
 +
161 203 8101
 +
 +
Passcode
 +
378382
 +
 +
Want to dial in from a phone?
 +
 +
Dial one of the following numbers:
 +
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)
 +
 +
Enter the meeting ID and passcode followed by #
 +
 +
Connecting from a room system?
 +
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
 +
 +
</div>
 +
</div>
 +
 +
<!-------------------------------------------------------------------------------------------------->
 
=== Agenda: ===
 
=== Agenda: ===
* [[EJFAT Group Meeting Feb. 17, 2022 | Previous meeting]]
+
* [[EJFAT EPSCI Meeting Feb. 23, 2022 | Previous meeting]]
 
*:
 
*:
 
*:
 
*:
Line 6: Line 37:
 
** Testing with ERSAP on FPGA LB
 
** Testing with ERSAP on FPGA LB
 
** Using script based LB Control Plane
 
** Using script based LB Control Plane
** PO for Compute submitted - ETA 1 June
+
** Awaiting Compute Equip.- ETA 1 June
** PO for Networking submitted - ETA 1 July
+
** Awaiting Networking Equip. - ETA 1 July
 +
** <s>End-to-end EJFAT ERSAP solution</s>
 +
** Pursuing Jumbo Frames - currently limited to 1472B frames
 +
** Building Interim Test Lab
 +
*** Use FPGA port #1 for local host subnet testing
 +
*** Use FPGA port #2 for switch fabric testing
 +
*** Use (2) spare/borrowed switches in DAQ data center/lab
 +
*** OS install on interim boxes
 +
*** Using spare 8 nodes (Abbott)
 +
*** Decision on Hall-D spare 10Gbs NICs for compute nodes
 +
*** Switch config for Jumbo frames
 +
*** [https://jeffersonlab-my.sharepoint.com/:b:/r/personal/goodrich_jlab_org/Documents/EJFAT/EJFAT%20Network%20Setup.pdf?csf=1&web=1&e=hkUo8k Diagram]
 
* Pending:
 
* Pending:
** End-to-end EJFAT ERSAP solution
 
 
** Minor f/w change for 'garbage' packets
 
** Minor f/w change for 'garbage' packets
 
** Support C libraries for LB Host Control Plane
 
** Support C libraries for LB Host Control Plane
 
** ESnet smartnic open-source GitHub repo (April)
 
** ESnet smartnic open-source GitHub repo (April)
 
** ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
 
** ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
** Test Lab build out
 
*** Use FPGA port #1 for local host subnet testing
 
*** Use FPGA port #2 for switch fabric testing
 
*** Use (2) spare/borrowed switches in DAQ data center/lab
 
*** Abbott supplying <s>8 rack mounted compute nodes</s>
 
*** Acquire (cheap) <s>8x</s> 10Gbs NICs for compute nodes ?  / Use existing NICs ?
 
*** <s>Plumbing networking to spaces</s>
 
*** <s>Configuration of network switches and Host CPU for FPGA LB </s>
 
*** [https://jeffersonlab-my.sharepoint.com/:b:/r/personal/goodrich_jlab_org/Documents/EJFAT/EJFAT%20Network%20Setup.pdf?csf=1&web=1&e=hkUo8k Diagram]
 
 
* To Do:
 
* To Do:
 
** C-based control plane
 
** C-based control plane
 
*** Feedback from Compute hosts design
 
*** Feedback from Compute hosts design
 
*** Control Plane Arp cache / network good citizen
 
*** Control Plane Arp cache / network good citizen
 +
** Hall-D EJFAT + SLURM
 +
** IPV6 testing
 +
** EJFAT Subnet
 
* [[Test Plans | Test Plan]]
 
* [[Test Plans | Test Plan]]
 
*:
 
*:

Latest revision as of 18:55, 2 March 2022

The meeting time is 2:00pm.

Connection Info:

You can connect using ZoomGov Video conferencing (ID: 161 203 8101). (Click "Expand" to the right for details -->):

Meeting URL
https://jlab-org.zoomgov.com/j/1612038101?pwd=Yk96QUcyT1NDVTRRUGNtOFVSSTdaUT09&from=addon

Meeting ID
161 203 8101

Passcode
378382

Want to dial in from a phone?

Dial one of the following numbers:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)

Enter the meeting ID and passcode followed by #

Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode

Agenda:

  • Previous meeting
  • Situation:
    • Testing with ERSAP on FPGA LB
    • Using script based LB Control Plane
    • Awaiting Compute Equip.- ETA 1 June
    • Awaiting Networking Equip. - ETA 1 July
    • End-to-end EJFAT ERSAP solution
    • Pursuing Jumbo Frames - currently limited to 1472B frames
    • Building Interim Test Lab
      • Use FPGA port #1 for local host subnet testing
      • Use FPGA port #2 for switch fabric testing
      • Use (2) spare/borrowed switches in DAQ data center/lab
      • OS install on interim boxes
      • Using spare 8 nodes (Abbott)
      • Decision on Hall-D spare 10Gbs NICs for compute nodes
      • Switch config for Jumbo frames
      • Diagram
  • Pending:
    • Minor f/w change for 'garbage' packets
    • Support C libraries for LB Host Control Plane
    • ESnet smartnic open-source GitHub repo (April)
    • ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
  • To Do:
    • C-based control plane
      • Feedback from Compute hosts design
      • Control Plane Arp cache / network good citizen
    • Hall-D EJFAT + SLURM
    • IPV6 testing
    • EJFAT Subnet
  • Test Plan
  • AOT

  • Actions:
    • David L, will check on spare 10Gbs NICs from Hall-D