Difference between revisions of "EJFAT Group Meeting Mar. 3, 2022"
Jump to navigation
Jump to search
(8 intermediate revisions by the same user not shown) | |||
Line 47: | Line 47: | ||
*** Using spare 8 nodes (Abbott) | *** Using spare 8 nodes (Abbott) | ||
*** Using Hall-D spare 10Gbs NICs | *** Using Hall-D spare 10Gbs NICs | ||
− | |||
*** [https://jeffersonlab-my.sharepoint.com/:b:/r/personal/goodrich_jlab_org/Documents/EJFAT/EJFAT%20Network%20Setup.pdf?csf=1&web=1&e=hkUo8k Diagram] | *** [https://jeffersonlab-my.sharepoint.com/:b:/r/personal/goodrich_jlab_org/Documents/EJFAT/EJFAT%20Network%20Setup.pdf?csf=1&web=1&e=hkUo8k Diagram] | ||
* Pending: | * Pending: | ||
− | ** Minor f/w change for 'garbage' packets | + | ** <s>Minor f/w change for 'garbage' packets</s> |
** Support C libraries for LB Host Control Plane | ** Support C libraries for LB Host Control Plane | ||
** ESnet smartnic open-source GitHub repo (April) | ** ESnet smartnic open-source GitHub repo (April) | ||
Line 57: | Line 56: | ||
** Connect | ** Connect | ||
*** FPGA port #2 to switch | *** FPGA port #2 to switch | ||
− | *** | + | *** Mellanox NIC port #2 to switch |
− | *** CentOS 7 install on interim boxes - next week | + | *** Switch config for FPGA |
− | + | ** CentOS 7 install on interim boxes - next week | |
− | |||
− | |||
** C-based control plane | ** C-based control plane | ||
*** Feedback from Compute hosts design | *** Feedback from Compute hosts design | ||
− | *** Control Plane Arp cache / network good citizen | + | *** Control Plane Arp cache / network good citizen - P4 may do |
− | |||
** Control Plane daemon for compute host | ** Control Plane daemon for compute host | ||
− | ** Jumbo Frames | + | ** Jumbo Frames |
** IPV6 testing | ** IPV6 testing | ||
** EJFAT Subnet | ** EJFAT Subnet | ||
− | |||
** Performance Measures (RT2022 - April 01 submission): | ** Performance Measures (RT2022 - April 01 submission): | ||
+ | *** Stress Test ERSAP / EJFAT | ||
*** Payload Size | *** Payload Size | ||
*** Reassembly | *** Reassembly |
Latest revision as of 17:08, 3 March 2022
The meeting time is 11:00am.
Connection Info:
You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon Meeting ID 161 012 5238 Passcode 503371 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Situation:
- Testing with ERSAP on FPGA LB
- Using script based LB Control Plane
- Awaiting Compute Equip.- ETA 1 June
- Awaiting Networking Equip. - ETA 1 July
- End-to-end EJFAT ERSAP solution
- Building Interim Test Lab
- Use FPGA port #1 for local host subnet testing
- Use FPGA port #2 for switch fabric testing
- Use (2) spare/borrowed switches
- Using spare 8 nodes (Abbott)
- Using Hall-D spare 10Gbs NICs
- Diagram
- Pending:
Minor f/w change for 'garbage' packets- Support C libraries for LB Host Control Plane
- ESnet smartnic open-source GitHub repo (April)
- ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
- To Do:
- Connect
- FPGA port #2 to switch
- Mellanox NIC port #2 to switch
- Switch config for FPGA
- CentOS 7 install on interim boxes - next week
- C-based control plane
- Feedback from Compute hosts design
- Control Plane Arp cache / network good citizen - P4 may do
- Control Plane daemon for compute host
- Jumbo Frames
- IPV6 testing
- EJFAT Subnet
- Performance Measures (RT2022 - April 01 submission):
- Stress Test ERSAP / EJFAT
- Payload Size
- Reassembly
- Multiple Back-Ends
- AOT
- Connect
- Test Plan
- AOT