Line 42: | Line 42: | ||
** Benchmarking | ** Benchmarking | ||
** Successfully Testing Calendar Epoch Advances | ** Successfully Testing Calendar Epoch Advances | ||
− | ** [https://indico.cern.ch/event/1109460/ RT2022 - April 08 submission - August Conference] | + | ** [https://indico.cern.ch/event/1109460/ RT2022 - April 08 submission - August 01-05 Conference] |
* Pending: | * Pending: | ||
** Compute Equip.- ETA 1 June | ** Compute Equip.- ETA 1 June | ||
Line 52: | Line 52: | ||
* To Do: | * To Do: | ||
** Near Term: | ** Near Term: | ||
− | *** Hall-B FT calorimeter and hodoscope streaming readout test (scheduled | + | *** Hall-B FT calorimeter and hodoscope streaming readout test (scheduled for week of 04/10 or 04/17) |
**** 2 crates for FT calorimeter, furnished with fADC250s. Total 332 channels. | **** 2 crates for FT calorimeter, furnished with fADC250s. Total 332 channels. | ||
**** 1 crate for the hodoscope that has 12 fADC (total 192 channels) | **** 1 crate for the hodoscope that has 12 fADC (total 192 channels) | ||
Line 75: | Line 75: | ||
**** distribute raw data across multiple compute nodes for calibration skims | **** distribute raw data across multiple compute nodes for calibration skims | ||
* AOT | * AOT | ||
+ | |||
=== Minutes: === | === Minutes: === | ||
<ul> | <ul> | ||
<li>EJFAT subnet: VLAN 937 172.19.22.0/24 | <li>EJFAT subnet: VLAN 937 172.19.22.0/24 | ||
− | <li>DAQ Farm machines | + | <li>DAQ Farm machines ''dafarm61 dafarm62 dafarm63 dafarm64'' currently on 129.57.29.0/24 subnet w/ additional i/f available for EJFAT subnet |
<ul> | <ul> | ||
− | <li>Running CentOS 7. | + | <li>Running CentOS 7.7 |
− | <li>10Gbs NIC, but need cables (copper twinX will do) | + | <li>10Gbs NIC, but '''need cables''' (copper twinX will do) |
</ul> | </ul> | ||
<li>New P4 to include | <li>New P4 to include |
Latest revision as of 14:24, 9 April 2022
The meeting time is 11:00am.
Connection Info:
You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon Meeting ID 161 012 5238 Passcode 503371 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Situation:
- Testing with End-to-end EJFAT ERSAP solution on FPGA LB
- Jumbo Frames - indra-s2,s3, alkaid, fpga
- Linux IP stack buffer size increased
- Using script based LB Control Plane
- Control Plane Gratuitous Arp cache updating (Scapy)
- Benchmarking
- Successfully Testing Calendar Epoch Advances
- RT2022 - April 08 submission - August 01-05 Conference
- Pending:
- Compute Equip.- ETA 1 June
- Networking Equip. - ETA 1 July
- Support C libraries for LB Host Control Plane
- ESnet smartnic open-source GitHub repo (April)
- ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
- Data_id <-> reassembly port mapping for powers-of-two ports per host
- To Do:
- Near Term:
- Hall-B FT calorimeter and hodoscope streaming readout test (scheduled for week of 04/10 or 04/17)
- 2 crates for FT calorimeter, furnished with fADC250s. Total 332 channels.
- 1 crate for the hodoscope that has 12 fADC (total 192 channels)
- Update firmware on all 3 VTPs to send fADC aggregated data frames in the EVIO format, through UDP.
- Design ERSAP FE application containing an actor that receives VTP frames through UDP, extracts information about the source/data ID and frame number (tick), and sends it to the EJFAT packetizing engine.
- Stage 1 testing: single stream/data-ID
- EJFAT LB + reassembly (RA) engine overall performance data-rate dependence.
- EJFAT LB + RA engine performance dependence from the EJFAT packetizing engine MTU settings
- Stage 2 testing: multi-stream/data_ID
- Use EJFAT LB firmware that supports load balancing of multiple source/data_IDs.
- EJFAT LB + RA engine performance as an event builder (i.e. source ID aggregator), a capability to send all available data_ID's with the same tick (time frame) to a single destination. NB Hall-B FT calorimeter and hodoscope setup is capable of sending up to 12 data streams.
- C-based control plane
- Feedback from Compute hosts design
- Control Plane daemon for compute host
- Hall-B FT calorimeter and hodoscope streaming readout test (scheduled for week of 04/10 or 04/17)
- Downstream:
- DPDK
- P4 enhancements for ipv4/6 ping, arp
- IPV6 testing
- EJFAT Subnet
- HOSS Hall-D EJFAT use case
- parallelize writing of raw data files
- distribute raw data across multiple compute nodes for calibration skims
- Near Term:
- AOT
Minutes:
- EJFAT subnet: VLAN 937 172.19.22.0/24
- DAQ Farm machines dafarm61 dafarm62 dafarm63 dafarm64 currently on 129.57.29.0/24 subnet w/ additional i/f available for EJFAT subnet
- Running CentOS 7.7
- 10Gbs NIC, but need cables (copper twinX will do)
- New P4 to include
- ARP, ping, iCMP ipv4/6
- ipv6 neighbor discovery TBD
- ERSAP feed end bottleneck needs investigation; Timmer's blaster may provide relief
- Peter Nugent/LBNL: LDRD LBNL+JLAB combines JLAB streaming + LBNL compute