Difference between revisions of "EJFAT EPSCI Meeting Apr. 13, 2022"
Jump to navigation
Jump to search
(Created page with "The meeting time is 2:00pm. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://jlab-org.zoomgov.com/j/1612038101?pwd...") |
|||
(One intermediate revision by the same user not shown) | |||
Line 52: | Line 52: | ||
** Peter Nugent/LBNL: LDRD LBNL+JLAB combines JLAB streaming + LBNL compute | ** Peter Nugent/LBNL: LDRD LBNL+JLAB combines JLAB streaming + LBNL compute | ||
* Pending: | * Pending: | ||
− | ** Compute Equip.- ETA 1 June | + | ** Compute Equip.- ETA 1 June - currently on track |
** Networking Equip. - ETA 1 July | ** Networking Equip. - ETA 1 July | ||
** Support C libraries for LB Host Control Plane | ** Support C libraries for LB Host Control Plane | ||
Line 77: | Line 77: | ||
*** IPV6 testing | *** IPV6 testing | ||
*** [https://www.epj-conferences.org/articles/epjconf/abs/2021/05/epjconf_chep2021_04005/epjconf_chep2021_04005.html HOSS Hall-D EJFAT use case] | *** [https://www.epj-conferences.org/articles/epjconf/abs/2021/05/epjconf_chep2021_04005/epjconf_chep2021_04005.html HOSS Hall-D EJFAT use case] | ||
+ | **** [https://docs.google.com/presentation/d/1m3rFm-1GymYv8zGimlAjL1NmWtXVfyIQdGzhx_j_BKE/edit?usp=sharing Slides] | ||
**** parallelize writing of raw data files | **** parallelize writing of raw data files | ||
**** distribute raw data across multiple compute nodes for calibration skims | **** distribute raw data across multiple compute nodes for calibration skims | ||
* AOT | * AOT | ||
<hr> | <hr> |
Latest revision as of 13:04, 13 April 2022
The meeting time is 2:00pm.
Connection Info:
You can connect using ZoomGov Video conferencing (ID: 161 203 8101). (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1612038101?pwd=Yk96QUcyT1NDVTRRUGNtOFVSSTdaUT09&from=addon Meeting ID 161 203 8101 Passcode 378382 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Situation:
- Testing with End-to-end EJFAT ERSAP solution on FPGA LB
- Jumbo Frames - indra-s2,s3, alkaid, fpga
- Linux IP stack buffer size increased
- Using script based LB Control Plane
- Control Plane Gratuitous Arp cache updating (Scapy)
- Benchmarking
- Successfully Testing Calendar Epoch Advances
RT2022 - April 08 submission - August 01-05 Conference- ERSAP feed end bottleneck needs investigation; Timmer's blaster may provide relief
- EJFAT subnet
- VLAN 937 172.19.22.0/24
- 10Gbs NIC, but need cables (copper twinX will do)
- DAQ Farm machines dafarm61 dafarm62 dafarm63 dafarm64 currently on 129.57.29.0/24 subnet w/ additional i/f available for EJFAT subnet
- Testing newly received FPGA load
- Support for arp, and ping
- Support for the port entropy field (Data_id <-> reassembly port mapping for powers-of-two ports per host)
- Peter Nugent/LBNL: LDRD LBNL+JLAB combines JLAB streaming + LBNL compute
- Pending:
- Compute Equip.- ETA 1 June - currently on track
- Networking Equip. - ETA 1 July
- Support C libraries for LB Host Control Plane
- ESnet smartnic open-source GitHub repo (April)
- ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
- To Do:
- Near Term:
- Hall-B FT calorimeter and hodoscope streaming readout test (scheduled for week of 04/10 or 04/17)
- 2 crates for FT calorimeter, furnished with fADC250s. Total 332 channels.
- 1 crate for the hodoscope that has 12 fADC (total 192 channels)
- Update firmware on all 3 VTPs to send fADC aggregated data frames in the EVIO format, through UDP.
- Design ERSAP FE application containing an actor that receives VTP frames through UDP, extracts information about the source/data ID and frame number (tick), and sends it to the EJFAT packetizing engine.
- Stage 1 testing: single stream/data-ID
- EJFAT LB + reassembly (RA) engine overall performance data-rate dependence.
- EJFAT LB + RA engine performance dependence from the EJFAT packetizing engine MTU settings
- Stage 2 testing: multi-stream/data_ID
- Use EJFAT LB firmware that supports load balancing of multiple source/data_IDs.
- EJFAT LB + RA engine performance as an event builder (i.e. source ID aggregator), a capability to send all available data_ID's with the same tick (time frame) to a single destination. NB Hall-B FT calorimeter and hodoscope setup is capable of sending up to 12 data streams.
- C-based control plane
- Feedback from Compute hosts design
- Control Plane daemon for compute host
- Hall-B FT calorimeter and hodoscope streaming readout test (scheduled for week of 04/10 or 04/17)
- Downstream:
- DPDK
- IPV6 testing
- HOSS Hall-D EJFAT use case
- Slides
- parallelize writing of raw data files
- distribute raw data across multiple compute nodes for calibration skims
- Near Term:
- AOT