(Created page with " The meeting time is 11:00am. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://jlab-org.zoomgov.com/j/1610125238?p...") |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 42: | Line 42: | ||
** Using script based LB Control Plane | ** Using script based LB Control Plane | ||
** ERSAP feed end bottleneck needs investigation; Timmer's blaster may provide relief | ** ERSAP feed end bottleneck needs investigation; Timmer's blaster may provide relief | ||
+ | ** (7) Newly rec'd New machines | ||
+ | *** to be installed on EJFAT subnet (VLAN 937 172.19.22.0/24) for 100 Gbs data network | ||
+ | *** to be installed on 129.57.29.0/24 for 1 Gbs control network | ||
** Spare EJFAT equip loaners: | ** Spare EJFAT equip loaners: | ||
*** (4) DAQ dev machines ''indra-s[1-3]'' 129.57.29/109.23[0-2] | *** (4) DAQ dev machines ''indra-s[1-3]'' 129.57.29/109.23[0-2] | ||
Line 68: | Line 71: | ||
**** Host S/W Reassembly | **** Host S/W Reassembly | ||
**** UDP Packet Loss | **** UDP Packet Loss | ||
− | *** Hall-B FT calorimeter and hodoscope streaming readout test - | + | **** '''Need new parameters - for experiments at 100Gbs''' |
− | **** May be able to use Abbott's indra-s1 setup | + | *** <s>Hall-B FT calorimeter and hodoscope streaming readout test</s> - OBE |
− | **** May be able to use new VTP f/w with Hall-B VTP's - (Ben Raydo) | + | **** <s>May be able to use Abbott's indra-s1 setup</s> |
− | **** CODA 3.10 + ERSAP for new VTP f/w | + | **** <s>May be able to use new VTP f/w with Hall-B VTP's - (Ben Raydo)</s> |
− | **** CODA 2.0 (non-streaming) for old VTP f/w | + | **** <s>CODA 3.10 + ERSAP for new VTP f/w</s> |
− | **** [https://jeffersonlab-my.sharepoint.com/:p:/r/personal/goodrich_jlab_org/Documents/EJFAT/hall-b_test.pptx?d=w31891fd52c1a420ea2b29efcdf5f9ed2&csf=1&web=1&e=JGyxHO Diagram] | + | **** <s>CODA 2.0 (non-streaming) for old VTP f/w</s> |
− | **** Hall-B to start taking data June 8 | + | **** <s>[https://jeffersonlab-my.sharepoint.com/:p:/r/personal/goodrich_jlab_org/Documents/EJFAT/hall-b_test.pptx?d=w31891fd52c1a420ea2b29efcdf5f9ed2&csf=1&web=1&e=JGyxHO Diagram]</s> |
− | **** Hall B VTPs on .167. subnet | + | **** <s>Hall-B to start taking data June 8</s> |
+ | **** <s>Hall B VTPs on .167. subnet</s> | ||
** Downstream (June/July): | ** Downstream (June/July): | ||
− | *** [https://www.epj-conferences.org/articles/epjconf/abs/2021/05/epjconf_chep2021_04005/epjconf_chep2021_04005.html HOSS] - June | + | *** [https://www.epj-conferences.org/articles/epjconf/abs/2021/05/epjconf_chep2021_04005/epjconf_chep2021_04005.html HOSS] - June |
**** parallelize writing of raw data files | **** parallelize writing of raw data files | ||
**** distribute raw data across multiple compute nodes for calibration skims | **** distribute raw data across multiple compute nodes for calibration skims | ||
Line 97: | Line 101: | ||
*** IPV6 testing | *** IPV6 testing | ||
*** [https://indico.cern.ch/event/1109460/ RT2022 - August 01-05 Conference] | *** [https://indico.cern.ch/event/1109460/ RT2022 - August 01-05 Conference] | ||
+ | *** [https://indico.cern.ch/event/1106990/ ACAT2022 - October 24-28, Italy] | ||
* AOT | * AOT | ||
<hr> | <hr> |
Latest revision as of 14:29, 2 June 2022
The meeting time is 11:00am.
Connection Info:
You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon Meeting ID 161 012 5238 Passcode 503371 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Situation:
- Rec'd new f/w build 28 April
- Specs
- Restores Jumbo Frames
- arp, ping - working
- Port entropy field - Passed Test for data_id stream horizontal reassembly with 10 streams
- Using script based LB Control Plane
- ERSAP feed end bottleneck needs investigation; Timmer's blaster may provide relief
- (7) Newly rec'd New machines
- to be installed on EJFAT subnet (VLAN 937 172.19.22.0/24) for 100 Gbs data network
- to be installed on 129.57.29.0/24 for 1 Gbs control network
- Spare EJFAT equip loaners:
- (4) DAQ dev machines indra-s[1-3] 129.57.29/109.23[0-2]
- alkaid: 24 Xeon Gold 3.4 GHz cores, 100Gbs
- indra-s1: 24 Xeon Gold 3.0 GHz cores, 100Gbs
- indra-s2: 32 Xeon Gold 3.2 GHz cores, 100Gbs
- indra-s3: 32 Xeon Gold 2.3 GHz cores, 100Gbs, 750GB ram disk
- (4) DAQ Farm machines dafarm6[1-4] currently on 129.57.29.17[1-4] - each 32 Xeon 2.0Ghz cores - 1 Gbs NIC + (4) 10Gbs Spare NICs
- (4) Unbuilt DAQ Farm machines - each 32 Xeon 2.0Ghz cores - 1 Gbs NIC + (4) 10Gbs Spare NICs
- (4) Spare 10Gbs Spare NICs
- (17) Hall-D machines - gluon120-36 129.57.52.9[2-36] - each 2 Xeon 2.6Ghz cores - 10Gbs NIC
- On Order:
- (4) DAQ dev machines indra-s[1-3] 129.57.29/109.23[0-2]
- Look at iperf2 for network testing
- Look at ROCE / NIC
- Rec'd new f/w build 28 April
- Pending:
- Support C libraries for LB Host Control Plane - in
unit testcode review - ESnet smartnic open-source GitHub repo (May)
- ESnet private, forkable Jlab P4 and simulations GitHub repo (May)
- Support C libraries for LB Host Control Plane - in
- To Do:
- Near Term:
- Network Performance Measurements:
- FPGA LB Throuput
- Host NICs
- Host S/W Reassembly
- UDP Packet Loss
- Need new parameters - for experiments at 100Gbs
Hall-B FT calorimeter and hodoscope streaming readout test- OBEMay be able to use Abbott's indra-s1 setupMay be able to use new VTP f/w with Hall-B VTP's - (Ben Raydo)CODA 3.10 + ERSAP for new VTP f/wCODA 2.0 (non-streaming) for old VTP f/wDiagramHall-B to start taking data June 8Hall B VTPs on .167. subnet
- Network Performance Measurements:
- Downstream (June/July):
- HOSS - June
- parallelize writing of raw data files
- distribute raw data across multiple compute nodes for calibration skims
- 1 Gbs at hi-luminosity
- Control Plane
- Will interact with SLURM / Kubernetes
- Python based (?)
- Control Plane daemon for compute host (?)
- Demonstrate CP based flexibility/elasticity
- Hall-D comms with DAQ 109 subnet require network customization; (EJFAT subnet)
- Hall-D EJFAT use case
- Hall-D EJFAT Network Diagram
- Configuration:
- ejfat-sw 100Gbs switch
- (6) PR408549 New Computers w/ X CPUs + U280 fpga
- (?) Retired Data Center Farm Nodes
- EJFAT subnet VLAN 937 172.19.22.0/24 - 100Gbs, Jumbo frames
- DPDK - ESnet reports can stream 100 Gbps using DPDK.
- IPV6 testing
- RT2022 - August 01-05 Conference
- ACAT2022 - October 24-28, Italy
- HOSS - June
- Near Term:
- AOT