Difference between revisions of "EJFAT EPSCI Meeting Feb. 8, 2023"
Jump to navigation
Jump to search
Line 29: | Line 29: | ||
## NERSC-ESnet-JLab on-site workshop Jan 31 - Feb 1 | ## NERSC-ESnet-JLab on-site workshop Jan 31 - Feb 1 | ||
## Manuscript ESnet / JLab FPGA Accelerated Transport (No. TNS-00484-2022.R1) FINAL version submitted for publication to IEEE Transactions on Nuclear Science (TNS). | ## Manuscript ESnet / JLab FPGA Accelerated Transport (No. TNS-00484-2022.R1) FINAL version submitted for publication to IEEE Transactions on Nuclear Science (TNS). | ||
+ | ## Final version of RT2022 EJFAT/IEEE-TNS submitted 02/07/2023 | ||
# Current Test set-up: | # Current Test set-up: | ||
## CLAS12 files -> Carl C++ Packetizer -> LB -> Carls's C++ Reassembler -> ERSAP | ## CLAS12 files -> Carl C++ Packetizer -> LB -> Carls's C++ Reassembler -> ERSAP |
Revision as of 18:48, 8 February 2023
The meeting time is 2:30pm.
Connection Info:
You can connect using Teams Link. (Click "Expand" to the right for details -->):
Agenda:
- Previous meeting
- Announcements:
- NERSC-ESnet-JLab on-site workshop Jan 31 - Feb 1
- Manuscript ESnet / JLab FPGA Accelerated Transport (No. TNS-00484-2022.R1) FINAL version submitted for publication to IEEE Transactions on Nuclear Science (TNS).
- Final version of RT2022 EJFAT/IEEE-TNS submitted 02/07/2023
- Current Test set-up:
- CLAS12 files -> Carl C++ Packetizer -> LB -> Carls's C++ Reassembler -> ERSAP
- NERSC Test set-up:
- Data Source: ? pre-event aggregated?
- Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting
- Proposed protobuf schema
- Assumes PID loop inside CP - but willing to change.
- Week of 2/6: Other ESnet projects
- Week of 2/13:
- Finish mock API server
- create an internal representation of the load balancer calendar
- implement the algorithm specified in "EJFAT Load Balancer Schedule Density from Reassembly Engine PID control"
- Week of 2/20: Other ESnet projects
- Week of 2/27: Add integration for the SmartNIC P4 Controller, synchronizing the internal state of the gRPC server with the P4 tables.
- Week of 3/6: Other ESnet projects
- Week of 3/13: Start work on integration test tooling.
- Proposed protobuf schema
- Data Sink:
- Perlmutter
- SPIN
- ERSAP
- Resources:
- CP gRPC i/f to RE PID: Non-streaming / Peer-to-Peer (Note on gRPC Publish/Subscribe)
- CP PID signal -> LB Schedule Density transform (Draft C++ algorithm completed)
- Proposed Changes to RE Meta-Data
- CP gRPC i/f to LB (pending)
- Status
- AOT