Difference between revisions of "EJFAT Group Meeting Apr. 13, 2023"

From epsciwiki
Jump to navigation Jump to search
(Created page with "The meeting time is 11:00am Eastern/USA. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [ https://jlab-org.zoomgov.com/j/...")
 
Line 58: Line 58:
 
### ERSAP
 
### ERSAP
 
### Networking for Test
 
### Networking for Test
## '''Test Plans''':
+
## [https://jeffersonlab.sharepoint.com/:u:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/NERSC%20Test%20Plan?csf=1&web=1&e=HgZALh '''Test Plans''':]
 
### Data Flows/Distributions (JLab, ESnet ?, ...)
 
### Data Flows/Distributions (JLab, ESnet ?, ...)
 
### Benchmarks:
 
### Benchmarks:

Revision as of 14:51, 13 April 2023

The meeting time is 11:00am Eastern/USA.

Connection Info:

You can connect using [ https://jlab-org.zoomgov.com/j/1611828967?pwd=UVVCS0pUVW5FMlphT0lRQXdoQ0o4Zz09&from=addon ZoomGov Video conferencing (ID: 161 012 5238)]. (Click "Expand" to the right for details -->):

Meeting URL
 https://jlab-org.zoomgov.com/j/1611828967

Meeting ID
161 182 8967

Passcode
570041

Want to dial in from a phone?

Dial one of the following numbers:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)

Enter the meeting ID and passcode followed by #

Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode


Agenda:

  1. Previous meeting
  2. Announcements:
    1. CHEP 2023
  3. NERSC Test Development:
    1. Data Source:
      1. JLAB, CLAS12, pre-event aggregated - 1 channel
      2. Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
    2. Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting
      1. Week of 2/13:
        1. Finish mock API server
        2. Create an internal representation of the load balancer calendar
        3. Implement the algorithm specified in "EJFAT Load Balancer Schedule Density from Reassembly Engine PID control"
      2. Week of 2/20: Other ESnet projects
      3. Week of 2/27: Add integration for the SmartNIC P4 Controller, synchronizing the internal state of the gRPC server with the P4 tables.
      4. Week of 3/6: Other ESnet projects
      5. Week of 3/13: Start work on integration test tooling.
        1. JLab to supply Event reception journaling tool
      6. Week of 3/20: Other ESnet projects
      7. Week of 3/27: CP Development
      8. Week of 4/02: Other ESnet projects
      9. Week of 4/07: Integration Testing
    3. Data Sink:
      1. Perlmutter
      2. ERSAP
      3. Networking for Test
    4. Test Plans:
      1. Data Flows/Distributions (JLab, ESnet ?, ...)
      2. Benchmarks:
        1. Network/Device Data Flow
        2. Event Reassembly/Reconstruction
        3. CP Schedule Management
  4. RT2022 Paper: Submission Process Complete
  5. ACAT2022 Paper: - submitted
    1. Simulation Results may bear fruit for NERSC Test
  6. Demo Ready EJFAT Instance
  7. EJFAT Operational Status Board -> Prometheus Reporting
  8. Hall B CLAS12 FT detector streaming test
  9. Resources:
    1. HPDF
  10. AOT