(Created page with "The meeting time is 2:30pm. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://teams.microsoft.com/l/meetup-join/19%...")
 
Line 49: Line 49:
 
# [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/EJFAT_ACAT_2022_QL_sub.pdf?csf=1&web=1&e=dR566P ACAT2022 Paper]: - submitted
 
# [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/EJFAT_ACAT_2022_QL_sub.pdf?csf=1&web=1&e=dR566P ACAT2022 Paper]: - submitted
 
# [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/pid-ql-rpt-cal.2.pdf?csf=1&web=1&e=kG3nFD '''Digital Twin''']
 
# [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/pid-ql-rpt-cal.2.pdf?csf=1&web=1&e=kG3nFD '''Digital Twin''']
 +
## [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/pid-ql-rpt.pdf?csf=1&web=1&e=tZub0Z Use FIFO Levels]
 +
## [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/pid-ql-rpt-x.0.pdf?csf=1&web=1&e=IbXIdg Use EPR]
 +
## [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/pid-ql-rpt-x.pdf?csf=1&web=1&e=VxsE8x Use FIFO Levels/Disbursement]
 
# Demo Ready EJFAT Instance
 
# Demo Ready EJFAT Instance
 
# EJFAT Operational Status Board -> Prometheus Reporting
 
# EJFAT Operational Status Board -> Prometheus Reporting

Revision as of 17:43, 24 May 2023

The meeting time is 2:30pm.

Connection Info:


Agenda:

  1. Previous meeting
  2. Announcements:
  3. NERSC Test Development:
    1. Data Source:
      1. JLAB, CLAS12, pre-triggered events - 1 channel
      2. Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
    2. Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting - ETA + 2 weeks?
      1. Week of 5/21: CP Development
    3. Data Sink:
      1. Perlmutter
      2. ERSAP
    4. Networking for Test - ETA + 2 weeks?
      1. L3VPN Design with ESNet (done)
      2. Configure L3VPN, establish peering (in progress)
      3. Vet the cybersecurity controls with the security group.  (in progress)
      4. Relocate to HACS-4
      5. Configure hosts to use tunnel, confirm traffic flow is as expected
      6. Implement Local network configuration changes/cybersecurity controls
    5. Test Plans - JLab, ESnet, NERSC:
    6. JLab Preliminary NERSC Test
  4. Hall B CLAS12 FT detector streaming test
  5. RT2022 Paper: Submission Process Complete
  6. ACAT2022 Paper: - submitted
  7. Digital Twin
    1. Use FIFO Levels
    2. Use EPR
    3. Use FIFO Levels/Disbursement
  8. Demo Ready EJFAT Instance
  9. EJFAT Operational Status Board -> Prometheus Reporting
  10. Resources:
    1. HPDF
  11. AOT