Difference between revisions of "EJFAT Group Meeting Jun. 1, 2023"

From epsciwiki
Jump to navigation Jump to search
(Created page with "The meeting time is 11:00am Eastern/USA. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [ https://jlab-org.zoomgov.com/j/...")
 
 
Line 37: Line 37:
 
# [https://docs.google.com/document/d/1CsBtDZEhK4k9POSeiLF4kzTQVMl7KwZtubVH-aEIyo4/edit NERSC Test Development]:  
 
# [https://docs.google.com/document/d/1CsBtDZEhK4k9POSeiLF4kzTQVMl7KwZtubVH-aEIyo4/edit NERSC Test Development]:  
 
## Data Source:  
 
## Data Source:  
### JLAB, CLAS12, pre-triggered events - 1 channel
+
### JLAB, CLAS12, pre-triggered/aggregated events - 1 channel
### Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
+
### Front End Packetizer pending mods for Tick-sync msg to CP IP using specially designated port
 
## [https://excalidraw.com/#room=66f0f7fbc2ca25f638bf,aYAB22Gl-Je5rngECJBLJQ Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting - '''ETA + 2 weeks?''']
 
## [https://excalidraw.com/#room=66f0f7fbc2ca25f638bf,aYAB22Gl-Je5rngECJBLJQ Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting - '''ETA + 2 weeks?''']
 
### Week of 5/28: '''(Off Project)'''  
 
### Week of 5/28: '''(Off Project)'''  

Latest revision as of 15:00, 1 June 2023

The meeting time is 11:00am Eastern/USA.

Connection Info:

You can connect using [ https://jlab-org.zoomgov.com/j/1611828967?pwd=UVVCS0pUVW5FMlphT0lRQXdoQ0o4Zz09&from=addon ZoomGov Video conferencing (ID: 161 012 5238)]. (Click "Expand" to the right for details -->):

Meeting URL
 https://jlab-org.zoomgov.com/j/1611828967

Meeting ID
161 182 8967

Passcode
570041

Want to dial in from a phone?

Dial one of the following numbers:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)

Enter the meeting ID and passcode followed by #

Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode


Agenda:

  1. Previous meeting
  2. Announcements:
  3. NERSC Test Development:
    1. Data Source:
      1. JLAB, CLAS12, pre-triggered/aggregated events - 1 channel
      2. Front End Packetizer pending mods for Tick-sync msg to CP IP using specially designated port
    2. Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting - ETA + 2 weeks?
      1. Week of 5/28: (Off Project)
    3. Data Sink:
      1. Perlmutter
      2. ERSAP
    4. Networking for Test - ETA + 2 weeks?
      1. L3VPN Design with ESNet (done)
      2. Configure L3VPN, establish peering (in progress)
      3. Vet the cybersecurity controls with the security group.  (in progress)
      4. Relocate to HACS-4
      5. Configure hosts to use tunnel, confirm traffic flow is as expected
      6. Implement Local network configuration changes/cybersecurity controls
    5. Test Plans - JLab, ESnet, NERSC:
    6. JLab Preliminary NERSC Test
  4. Hall B CLAS12 detector streaming test
    1. Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
    2. Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP
    3. We have only one fiber between hallb counting room and counting house second floor available right now, will order more fibers installation, may take several months
    4. There are several available fibers between counting house second floor and computer center (like 6), we can use a couple of them for our test
    5. Summary: sometime in October, we should have 48 10GBit links from 24 VTPs connected to the switch in hallb counting room, with that switch connected to computer center by 2x100GBit links
  5. RT2022 Paper: Submission Process Complete
  6. ACAT2022 Paper: - submitted
  7. CHEP 2023 Conference Publication
  8. Simulation
    1. Use FIFO Levels
    2. Use EPR
    3. Use FIFO Levels/Disbursement
  9. Demo Ready EJFAT Instance
  10. EJFAT Operational Status Board -> Prometheus Reporting
  11. Resources:
    1. HPDF
  12. AOT