Difference between revisions of "EJFAT EPSCI Meeting Jun. 14, 2023"

From epsciwiki
Jump to navigation Jump to search
(Created page with "The meeting time is 2:30pm. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://teams.microsoft.com/l/meetup-join/19%...")
 
 
Line 33: Line 33:
 
### JLAB, CLAS12, pre-triggered events - 1 channel
 
### JLAB, CLAS12, pre-triggered events - 1 channel
 
### Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
 
### Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
## [https://excalidraw.com/#room=66f0f7fbc2ca25f638bf,aYAB22Gl-Je5rngECJBLJQ Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting - '''ETA + 2 weeks?''']
+
## [https://excalidraw.com/#room=66f0f7fbc2ca25f638bf,aYAB22Gl-Je5rngECJBLJQ Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting]
 
### Week of 6/11: '''Derek out through 6/21'''  
 
### Week of 6/11: '''Derek out through 6/21'''  
 
### Local Installation of ESnet CP - '''in progress'''
 
### Local Installation of ESnet CP - '''in progress'''
Line 39: Line 39:
 
### Perlmutter
 
### Perlmutter
 
### ERSAP
 
### ERSAP
## Networking for Test - '''ETA + 2 weeks?'''
+
## Networking for Test
 
### <s>L3VPN Design with ESNet </s>
 
### <s>L3VPN Design with ESNet </s>
 
### <s>Vet the cybersecurity controls with the security group.  </s>
 
### <s>Vet the cybersecurity controls with the security group.  </s>
Line 45: Line 45:
 
### Configure L3VPN, establish peering '''next'''
 
### Configure L3VPN, establish peering '''next'''
 
### Relocate to HACS-4 - '''soon'''
 
### Relocate to HACS-4 - '''soon'''
### Configure hosts to use tunnel, confirm traffic flow is as expected
+
### Configure hosts to use tunnel, confirm traffic flow is as expected - '''last'''
 
## '''JLab Preliminary NERSC Test'''
 
## '''JLab Preliminary NERSC Test'''
 
## [https://docs.google.com/document/d/13VvyCMNJW3nIVZMgqOuPn3MBSLmfAl1zLkJAHw8fj04/edit?usp=drivesdk '''Test Plans - JLab, ESnet, NERSC''':]
 
## [https://docs.google.com/document/d/13VvyCMNJW3nIVZMgqOuPn3MBSLmfAl1zLkJAHw8fj04/edit?usp=drivesdk '''Test Plans - JLab, ESnet, NERSC''':]
# '''Hall B CLAS12 detector streaming test'''
+
# Hall B CLAS12 detector streaming test
 
## Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
 
## Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
 
## Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP
 
## Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP

Latest revision as of 17:34, 14 June 2023

The meeting time is 2:30pm.

Connection Info:


Agenda:

  1. Previous meeting
  2. Announcements:
    1. Lab Closed 06/19/2023
    2. Computer center power outage 06/20/2023 Rescheduled
  3. NERSC Test Development:
    1. Data Source:
      1. JLAB, CLAS12, pre-triggered events - 1 channel
      2. Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
    2. Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting
      1. Week of 6/11: Derek out through 6/21
      2. Local Installation of ESnet CP - in progress
    3. Data Sink:
      1. Perlmutter
      2. ERSAP
    4. Networking for Test
      1. L3VPN Design with ESNet
      2. Vet the cybersecurity controls with the security group.
      3. Implement Local network configuration changes/cybersecurity controls
      4. Configure L3VPN, establish peering next
      5. Relocate to HACS-4 - soon
      6. Configure hosts to use tunnel, confirm traffic flow is as expected - last
    5. JLab Preliminary NERSC Test
    6. Test Plans - JLab, ESnet, NERSC:
  4. Hall B CLAS12 detector streaming test
    1. Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
    2. Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP
    3. We have only one fiber between hallb counting room and counting house second floor available right now, will order more fibers installation, may take several months
    4. There are several available fibers between counting house second floor and computer center (like 6), we can use a couple of them for our test
    5. Summary: sometime in October, we should have 48 10GBit links from 24 VTPs connected to the switch in hallb counting room, with that switch connected to computer center by 2x100GBit links
  5. RT2022 Paper: Submission Process Complete
  6. ACAT2022 Paper: - submitted
  7. CHEP 2023 Conference Publication - in progress
  8. Simulation
    1. Use FIFO Levels
    2. Use EPR
    3. Use FIFO Levels/Disbursement
  9. Demo Ready EJFAT Instance
  10. EJFAT Operational Status Board -> Prometheus Reporting
  11. Resources:
    1. HPDF
  12. AOT