Difference between revisions of "EJFAT EPSCI Meeting Jun. 14, 2023"
Jump to navigation
Jump to search
(Created page with "The meeting time is 2:30pm. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://teams.microsoft.com/l/meetup-join/19%...") |
m (→Agenda:) |
||
Line 33: | Line 33: | ||
### JLAB, CLAS12, pre-triggered events - 1 channel | ### JLAB, CLAS12, pre-triggered events - 1 channel | ||
### Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host | ### Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host | ||
− | ## [https://excalidraw.com/#room=66f0f7fbc2ca25f638bf,aYAB22Gl-Je5rngECJBLJQ Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting | + | ## [https://excalidraw.com/#room=66f0f7fbc2ca25f638bf,aYAB22Gl-Je5rngECJBLJQ Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting] |
### Week of 6/11: '''Derek out through 6/21''' | ### Week of 6/11: '''Derek out through 6/21''' | ||
### Local Installation of ESnet CP - '''in progress''' | ### Local Installation of ESnet CP - '''in progress''' | ||
Line 39: | Line 39: | ||
### Perlmutter | ### Perlmutter | ||
### ERSAP | ### ERSAP | ||
− | ## Networking for Test | + | ## Networking for Test |
### <s>L3VPN Design with ESNet </s> | ### <s>L3VPN Design with ESNet </s> | ||
### <s>Vet the cybersecurity controls with the security group. </s> | ### <s>Vet the cybersecurity controls with the security group. </s> | ||
Line 45: | Line 45: | ||
### Configure L3VPN, establish peering '''next''' | ### Configure L3VPN, establish peering '''next''' | ||
### Relocate to HACS-4 - '''soon''' | ### Relocate to HACS-4 - '''soon''' | ||
− | ### Configure hosts to use tunnel, confirm traffic flow is as expected | + | ### Configure hosts to use tunnel, confirm traffic flow is as expected - '''last''' |
## '''JLab Preliminary NERSC Test''' | ## '''JLab Preliminary NERSC Test''' | ||
## [https://docs.google.com/document/d/13VvyCMNJW3nIVZMgqOuPn3MBSLmfAl1zLkJAHw8fj04/edit?usp=drivesdk '''Test Plans - JLab, ESnet, NERSC''':] | ## [https://docs.google.com/document/d/13VvyCMNJW3nIVZMgqOuPn3MBSLmfAl1zLkJAHw8fj04/edit?usp=drivesdk '''Test Plans - JLab, ESnet, NERSC''':] | ||
− | # | + | # Hall B CLAS12 detector streaming test |
## Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP | ## Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP | ||
## Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP | ## Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP |
Latest revision as of 17:34, 14 June 2023
The meeting time is 2:30pm.
Connection Info:
You can connect using Teams Link. (Click "Expand" to the right for details -->):
Agenda:
- Previous meeting
- Announcements:
- Lab Closed 06/19/2023
Computer center power outage 06/20/2023Rescheduled
- NERSC Test Development:
- Data Source:
- JLAB, CLAS12, pre-triggered events - 1 channel
- Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
- Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting
- Week of 6/11: Derek out through 6/21
- Local Installation of ESnet CP - in progress
- Data Sink:
- Perlmutter
- ERSAP
- Networking for Test
L3VPN Design with ESNetVet the cybersecurity controls with the security group.Implement Local network configuration changes/cybersecurity controls- Configure L3VPN, establish peering next
- Relocate to HACS-4 - soon
- Configure hosts to use tunnel, confirm traffic flow is as expected - last
- JLab Preliminary NERSC Test
- Test Plans - JLab, ESnet, NERSC:
- Data Source:
- Hall B CLAS12 detector streaming test
- Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
- Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP
- We have only one fiber between hallb counting room and counting house second floor available right now, will order more fibers installation, may take several months
- There are several available fibers between counting house second floor and computer center (like 6), we can use a couple of them for our test
- Summary: sometime in October, we should have 48 10GBit links from 24 VTPs connected to the switch in hallb counting room, with that switch connected to computer center by 2x100GBit links
- RT2022 Paper: Submission Process Complete
- ACAT2022 Paper: - submitted
- CHEP 2023 Conference Publication - in progress
- Simulation
- Demo Ready EJFAT Instance
- EJFAT Operational Status Board -> Prometheus Reporting
- Resources:
- AOT