Difference between revisions of "EPSCI SRO Meeting Jun. 26 2023"

From epsciwiki
Jump to navigation Jump to search
Line 40: Line 40:
 
## Deadline for the paper is in September
 
## Deadline for the paper is in September
 
# GEM detector streaming readout
 
# GEM detector streaming readout
 +
# Considering a modification of the meeting's starting time.
 
## Allocate some time to testing and optimizing stream mining actors within the ERSAP framework.
 
## Allocate some time to testing and optimizing stream mining actors within the ERSAP framework.
 
## @ToDo: GBT link level parallelization
 
## @ToDo: GBT link level parallelization

Revision as of 15:31, 26 June 2023


Connection Info:

You can connect using https://jlab-org.zoomgov.com/j/1608556097 (Meeting ID: 1160 855 6097). (Click "Expand" to the right for details -->):

One tap mobile: US: +16692545252,,1618740469# or +16468287666,,1618740469#
Meeting URL: https://jlab-org.zoomgov.com/j/1608556097?pwd=S1Fzbk9ubnZsOW5pRStqWW5MVTZLZz09&from=addon
Meeting ID: 160 855 6097
Passcode: 923910

Join by Telephone
For higher quality, dial a number based on your current location.
Dial:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)
Meeting ID: 160 855 6097

International numbers
Join from an H.323/SIP room system
H.323: 161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 160 855 6097
Passcode: 923910
SIP: 1608556097@sip.zoomgov.com
Passcode: 923910


Agenda:

  1. Announcements
    1. CHEP23 ERSAP presentation
    2. Deadline for the paper is in September
  2. GEM detector streaming readout
  3. Considering a modification of the meeting's starting time.
    1. Allocate some time to testing and optimizing stream mining actors within the ERSAP framework.
    2. @ToDo: GBT link level parallelization
      1. Parallelize GBT link five subgroups
  4. CLAS12 streaming readout
    1. Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale
    2. Develop ERSAP actors for the CLAS12 trigger.
  5. Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test
    1. Local pilot test
      1. Verify the functionality and performance of the EJFAT transport system
      2. Optimize stream processing back-end in terms of performance and hardware utilization
  6. ERSAP Roadmap
    1. ERSAP v2.0
  7. AOT

Useful References


Minutes: