Difference between revisions of "EPSCI SRO Meeting Jun. 26 2023"

From epsciwiki
Jump to navigation Jump to search
Line 48: Line 48:
 
## Develop ERSAP actors for the CLAS12 trigger.
 
## Develop ERSAP actors for the CLAS12 trigger.
 
# <strong>Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test</strong>  
 
# <strong>Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test</strong>  
 +
## Docker image
 
## Local pilot test
 
## Local pilot test
 
### Verify the functionality and performance of the EJFAT transport system
 
### Verify the functionality and performance of the EJFAT transport system

Revision as of 15:36, 26 June 2023


Connection Info:

You can connect using https://jlab-org.zoomgov.com/j/1608556097 (Meeting ID: 1160 855 6097). (Click "Expand" to the right for details -->):


Agenda:

  1. Announcements
    1. CHEP23 ERSAP presentation
    2. Deadline for the paper is in September
  2. GEM detector streaming readout
  3. Considering a modification of the meeting's starting time.
    1. Allocate some time to testing and optimizing stream mining actors within the ERSAP framework.
    2. @ToDo: GBT link level parallelization
      1. Parallelize GBT link five subgroups
  4. CLAS12 streaming readout
    1. Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale
    2. Develop ERSAP actors for the CLAS12 trigger.
  5. Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test
    1. Docker image
    2. Local pilot test
      1. Verify the functionality and performance of the EJFAT transport system
      2. Optimize stream processing back-end in terms of performance and hardware utilization
  6. ERSAP Roadmap
    1. ERSAP v2.0
  7. AOT

Useful References


Minutes: