Line 54: | Line 54: | ||
#### In general, for the hi-speed network: IPv4: 129.57.177.0/25 IPv6: 2620:0:22f0:677::<3rd octet of IPv4>:<4th octet of IPv4>/64 And for the low-speed (mgmt) network: IPv4: 129.57.177.128/25 IPv6: 2620:0:22f0:1677::<3rd octet of IPv4>:<4th octet of IPv4>/64 | #### In general, for the hi-speed network: IPv4: 129.57.177.0/25 IPv6: 2620:0:22f0:677::<3rd octet of IPv4>:<4th octet of IPv4>/64 And for the low-speed (mgmt) network: IPv4: 129.57.177.128/25 IPv6: 2620:0:22f0:1677::<3rd octet of IPv4>:<4th octet of IPv4>/64 | ||
### '''Unexpected Prefix''' - have withdrawn the advertisement of that network from the EJFAT tunnel | ### '''Unexpected Prefix''' - have withdrawn the advertisement of that network from the EJFAT tunnel | ||
+ | ### '''Jumbo Frame availability thru ESnet network layers to LB''' | ||
## JLab Preliminary NERSC Test | ## JLab Preliminary NERSC Test | ||
### <s>Vardan's Metrics/Horizontal Scaling</s> - '''Using for CHEP Paper''' | ### <s>Vardan's Metrics/Horizontal Scaling</s> - '''Using for CHEP Paper''' | ||
Line 69: | Line 70: | ||
## '''LDRD Pending''' | ## '''LDRD Pending''' | ||
## '''Targeting May 2024 during Beam downtime in Hall B''' | ## '''Targeting May 2024 during Beam downtime in Hall B''' | ||
+ | ## '''Data Comprehensibility Studies using Hall B/D sample data''' | ||
# [https://ieeexplore.ieee.org/document/10046405 RT2022 Paper]: Submission Process Complete | # [https://ieeexplore.ieee.org/document/10046405 RT2022 Paper]: Submission Process Complete | ||
# [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/EJFAT_ACAT_2022_QL_sub.pdf?csf=1&web=1&e=dR566P ACAT2022 Paper]: - submitted | # [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/EJFAT_ACAT_2022_QL_sub.pdf?csf=1&web=1&e=dR566P ACAT2022 Paper]: - submitted |
Latest revision as of 15:31, 7 September 2023
The meeting time is 11:00am Eastern/USA.
Connection Info:
You can connect using [ https://jlab-org.zoomgov.com/j/1611828967?pwd=UVVCS0pUVW5FMlphT0lRQXdoQ0o4Zz09&from=addon ZoomGov Video conferencing (ID: 161 012 5238)]. (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1611828967 Meeting ID 161 182 8967 Passcode 570041 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Announcements:
- NERSC Test Development:
- Data Source:
- JLAB, CLAS12, pre-triggered events - 1 channel
- Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
Derek Howard (ESnet) to- completebuild CPfor EJFAT and Perlmutter at NERSC with JLab assistingLocal Installation of ESnet CP- complete
- Data Sink:
- Perlmutter
- ERSAP
- Networking for Test
L3VPN Design with ESNetVet the cybersecurity controls with the security group.Implement Local network configuration changes/cybersecurity controlsConfigure L3VPN, establish peeringRelocate to HACS-4- Configure hosts to use tunnel, confirm traffic flow is as expected -
IPV4, IPV6 pending- "There is a mapping that you can use to obtain IPv6 addresses from the IPv4 address. E.g., IPv4 129.57.177.121 ---> IPv6 2620:0:22f0:677::177:121 "
- In general, for the hi-speed network: IPv4: 129.57.177.0/25 IPv6: 2620:0:22f0:677::<3rd octet of IPv4>:<4th octet of IPv4>/64 And for the low-speed (mgmt) network: IPv4: 129.57.177.128/25 IPv6: 2620:0:22f0:1677::<3rd octet of IPv4>:<4th octet of IPv4>/64
- Unexpected Prefix - have withdrawn the advertisement of that network from the EJFAT tunnel
- Jumbo Frame availability thru ESnet network layers to LB
- JLab Preliminary NERSC Test
Vardan's Metrics/Horizontal Scaling- Using for CHEP Paper- Preliminary Testing: New LB f/w and CP:
JLab, ESnet- new CP bug - rule update failure
- NERSC may be ready for connectivity test soon
- Test Plans - JLab, ESnet, NERSC:
- Data Source:
- Hall B CLAS12 detector streaming test
- Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
- Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP
- We have only one fiber between hallb counting room and counting house second floor available right now, will order more fibers installation, may take several months
- There are several available fibers between counting house second floor and computer center (like 6), we can use a couple of them for our test
- Summary: sometime in October, we should have 48 10GBit links from 24 VTPs connected to the switch in hallb counting room, with that switch connected to computer center by 2x100GBit links
- Need to develop CONOPS with Streaming group (Abbott)
- LDRD Pending
- Targeting May 2024 during Beam downtime in Hall B
- Data Comprehensibility Studies using Hall B/D sample data
- RT2022 Paper: Submission Process Complete
- ACAT2022 Paper: - submitted
- CHEP 2023 Conference Publication - QL/PID focused - Derek/Mike/Carl - deadline September 8, 2023
- Define the problem - all constants, parameters, etc. for both homogeneous cluster, heterogeneous cluster
- Run baseline sims for both using no control
- Incrementally show value of PID control; first Kp, then Kp+Kd, then Kp+Kd+Ki
- Show value of QL control
- Run with real CP using simware sender/rcvrs to compare to simulations
- Compare all results to Queuing Theory predictions
- EJFAT Phase II - will use this mtg in September
- Demo Ready EJFAT Instance
- EJFAT Operational Status Board -> Prometheus Reporting
- Resources:
- AOT