Difference between revisions of "AIEC Weekly Meeting Sep. 23, 2021"
Jump to navigation
Jump to search
(3 intermediate revisions by the same user not shown) | |||
Line 48: | Line 48: | ||
=== Minutes === | === Minutes === | ||
− | '' | + | Attendees: Naomi J., Torri J., Nikhil K., Thomas B., Kishan R., Mike G., David L. |
+ | |||
+ | * Diana's Document on Gain Correction Factor | ||
+ | ** Not enough people read it. Assign as action item for next week | ||
+ | ** Diana identified a couple of more items to add | ||
+ | *: | ||
+ | * Why is 2018 data so bad? | ||
+ | ** Naomi thought about some possibilities | ||
+ | *** Beam trips were much worse | ||
+ | *** Diamond was worse (Alex A. reported strong dependence on orientation) | ||
+ | *** Beam tune (at one point better agreement between orientations noticed after high-quality beam tune) | ||
+ | ** How to address | ||
+ | *** Naomi suggested we focus on using the CDC HV board currents instead of external beam parameters. | ||
+ | *** Some concern over how much time to spend on reproducing GCF for 2018 data as it prevents us from moving towards the final goals of the project. | ||
+ | *: | ||
+ | * Good File List (Nikhil) | ||
+ | ** Nikhil was able to produce a list of runs for which the 001 file (the one used for calibrations) was "good" (i.e. no beam trips) | ||
+ | ** System scrapes data from CCDB utilities. | ||
+ | *** It was noted that there is a python API for CCDB. This was not pointed out to Nikhil earlier, but he now has a working system so we go with that. | ||
+ | *** Run the system over the 000 and 002 files from 2018 so we can identify if which runs have at least one "good" file amongst the first 3 | ||
+ | *: | ||
+ | * PrimEx Run Plan | ||
+ | ** CDC is expected to be turned on about 9.5 days from now (n.b. that schedule has since changed) | ||
+ | ** Expect 16 shifts with beam on (4 days) | ||
+ | ** One of us will need to sit in as additional remote shifter to handle determining the HV setting and implementing it between runs | ||
+ | ** We will need to set up a schedule for which of us will be online | ||
+ | *** Thomas, Naomi, Torri, and David will likely be the ones implementing this. | ||
+ | *** We will set up internal training | ||
+ | *: | ||
+ | * Time to Distance Calibration | ||
+ | ** No progress last week | ||
+ | *: | ||
+ | * CLAS12 (Torri) | ||
+ | ** Trying to get a good run list. Not clear how to obtain this | ||
+ | ** Able to produce Trees now | ||
+ | ** Setup a GitHub page listing projects | ||
+ | *** Need to add everyone's Github account to it | ||
+ | |||
+ | |||
+ | ==== Action Items ==== | ||
+ | # Read the Gain Correction Factor Status Document (Everyone) | ||
+ | # Check for "good" runs in the first 3 files (0,1,2) of the 2018 data (Nikhil, Torri) | ||
+ | # Schedule for who from our group will be on shift to change HV settings | ||
+ | #* [https://halldweb.jlab.org/DocDB/0052/005221/001/AIEC_HV_plans.pdf Plans] (Naomi's slides) | ||
+ | #* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Summer2021 PrimEx Run Plan] | ||
+ | # Add everyone's Github account to the Github [https://github.com/JeffersonLab/AIEC/projects AIEC Projects page] (Torri) |
Latest revision as of 10:13, 28 September 2021
The meeting time is 4:00pm.
Connection Info:
You can connect using BlueJeans Video conferencing (ID: 122 747 574). (Click "Expand" to the right for details -->):
Meeting URL https://bluejeans.com/122747574/3273?src=join_info Meeting ID 122 747 574 Want to dial in from a phone? Dial one of the following numbers: +1.888.240.2560 (US Toll Free) (see all numbers - https://www.bluejeans.com/premium-numbers) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- AIEC Gain Factor Summary
- PI Exchange (see right)
- Good file list (Nikhil)
- PrimEx run plan (Naomi)
- CPP projected start date: May 2, 2022
- Time-to-Distance (Diana)
- CLAS12 Data prep (Torri)
- getting good run list from RGA data
- making trees with "non standard" banks: TBHits, TBTracks
- totally remade GitHub repo
- Deployment System/Shift Worker Interface
- Publication planning
- Calibration parameter prediction
- AOT
Minutes
Attendees: Naomi J., Torri J., Nikhil K., Thomas B., Kishan R., Mike G., David L.
- Diana's Document on Gain Correction Factor
- Not enough people read it. Assign as action item for next week
- Diana identified a couple of more items to add
- Why is 2018 data so bad?
- Naomi thought about some possibilities
- Beam trips were much worse
- Diamond was worse (Alex A. reported strong dependence on orientation)
- Beam tune (at one point better agreement between orientations noticed after high-quality beam tune)
- How to address
- Naomi suggested we focus on using the CDC HV board currents instead of external beam parameters.
- Some concern over how much time to spend on reproducing GCF for 2018 data as it prevents us from moving towards the final goals of the project.
- Naomi thought about some possibilities
- Good File List (Nikhil)
- Nikhil was able to produce a list of runs for which the 001 file (the one used for calibrations) was "good" (i.e. no beam trips)
- System scrapes data from CCDB utilities.
- It was noted that there is a python API for CCDB. This was not pointed out to Nikhil earlier, but he now has a working system so we go with that.
- Run the system over the 000 and 002 files from 2018 so we can identify if which runs have at least one "good" file amongst the first 3
- PrimEx Run Plan
- CDC is expected to be turned on about 9.5 days from now (n.b. that schedule has since changed)
- Expect 16 shifts with beam on (4 days)
- One of us will need to sit in as additional remote shifter to handle determining the HV setting and implementing it between runs
- We will need to set up a schedule for which of us will be online
- Thomas, Naomi, Torri, and David will likely be the ones implementing this.
- We will set up internal training
- Time to Distance Calibration
- No progress last week
- CLAS12 (Torri)
- Trying to get a good run list. Not clear how to obtain this
- Able to produce Trees now
- Setup a GitHub page listing projects
- Need to add everyone's Github account to it
Action Items
- Read the Gain Correction Factor Status Document (Everyone)
- Check for "good" runs in the first 3 files (0,1,2) of the 2018 data (Nikhil, Torri)
- Schedule for who from our group will be on shift to change HV settings
- Plans (Naomi's slides)
- PrimEx Run Plan
- Add everyone's Github account to the Github AIEC Projects page (Torri)