Difference between revisions of "EJFAT EPSCI Meeting May. 24, 2023"

From epsciwiki
Jump to navigation Jump to search
(Created page with "The meeting time is 2:30pm. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://teams.microsoft.com/l/meetup-join/19%...")
 
 
(4 intermediate revisions by the same user not shown)
Line 45: Line 45:
 
## [https://docs.google.com/document/d/13VvyCMNJW3nIVZMgqOuPn3MBSLmfAl1zLkJAHw8fj04/edit?usp=drivesdk '''Test Plans - JLab, ESnet, NERSC''':]
 
## [https://docs.google.com/document/d/13VvyCMNJW3nIVZMgqOuPn3MBSLmfAl1zLkJAHw8fj04/edit?usp=drivesdk '''Test Plans - JLab, ESnet, NERSC''':]
 
## '''JLab Preliminary NERSC Test'''
 
## '''JLab Preliminary NERSC Test'''
# '''Hall B CLAS12 FT detector streaming test'''
+
# '''Hall B CLAS12 detector streaming test'''
 +
## Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
 +
## Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP
 +
## We have only one fiber between hallb counting room and counting house second floor available right now, will order more fibers installation, may take several months
 +
## There are several available fibers between counting house second floor and computer center (like 6), we can use a couple of them for our test
 +
## Summary: sometime in October, we should have 48 10GBit links from 24 VTPs connected to the switch in hallb counting room, with that switch connected to computer center by 2x100GBit links
 
# [https://ieeexplore.ieee.org/document/10046405 RT2022 Paper]: Submission Process Complete
 
# [https://ieeexplore.ieee.org/document/10046405 RT2022 Paper]: Submission Process Complete
 
# [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/EJFAT_ACAT_2022_QL_sub.pdf?csf=1&web=1&e=dR566P ACAT2022 Paper]: - submitted
 
# [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/EJFAT_ACAT_2022_QL_sub.pdf?csf=1&web=1&e=dR566P ACAT2022 Paper]: - submitted
# [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/pid-ql-rpt-cal.2.pdf?csf=1&web=1&e=kG3nFD '''Digital Twin''']
+
# '''Simulation'''
 +
## [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/pid-ql-rpt.pdf?csf=1&web=1&e=tZub0Z Use FIFO Levels]
 +
## [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/pid-ql-rpt-x.0.pdf?csf=1&web=1&e=IbXIdg Use EPR]
 +
## [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/pid-ql-rpt-x.pdf?csf=1&web=1&e=VxsE8x Use FIFO Levels/Disbursement]
 
# Demo Ready EJFAT Instance
 
# Demo Ready EJFAT Instance
 
# EJFAT Operational Status Board -> Prometheus Reporting
 
# EJFAT Operational Status Board -> Prometheus Reporting

Latest revision as of 17:22, 31 May 2023

The meeting time is 2:30pm.

Connection Info:


Agenda:

  1. Previous meeting
  2. Announcements:
  3. NERSC Test Development:
    1. Data Source:
      1. JLAB, CLAS12, pre-triggered events - 1 channel
      2. Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
    2. Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting - ETA + 2 weeks?
      1. Week of 5/21: CP Development
    3. Data Sink:
      1. Perlmutter
      2. ERSAP
    4. Networking for Test - ETA + 2 weeks?
      1. L3VPN Design with ESNet (done)
      2. Configure L3VPN, establish peering (in progress)
      3. Vet the cybersecurity controls with the security group.  (in progress)
      4. Relocate to HACS-4
      5. Configure hosts to use tunnel, confirm traffic flow is as expected
      6. Implement Local network configuration changes/cybersecurity controls
    5. Test Plans - JLab, ESnet, NERSC:
    6. JLab Preliminary NERSC Test
  4. Hall B CLAS12 detector streaming test
    1. Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
    2. Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP
    3. We have only one fiber between hallb counting room and counting house second floor available right now, will order more fibers installation, may take several months
    4. There are several available fibers between counting house second floor and computer center (like 6), we can use a couple of them for our test
    5. Summary: sometime in October, we should have 48 10GBit links from 24 VTPs connected to the switch in hallb counting room, with that switch connected to computer center by 2x100GBit links
  5. RT2022 Paper: Submission Process Complete
  6. ACAT2022 Paper: - submitted
  7. Simulation
    1. Use FIFO Levels
    2. Use EPR
    3. Use FIFO Levels/Disbursement
  8. Demo Ready EJFAT Instance
  9. EJFAT Operational Status Board -> Prometheus Reporting
  10. Resources:
    1. HPDF
  11. AOT