Difference between revisions of "EJFAT Group Meeting Jun. 15, 2023"
Jump to navigation
Jump to search
(Created page with "The meeting time is 11:00am Eastern/USA. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [ https://jlab-org.zoomgov.com/j/...") |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 32: | Line 32: | ||
=== Agenda: === | === Agenda: === | ||
− | # [[EJFAT Group Meeting Jun. | + | # [[EJFAT Group Meeting Jun. 8, 2023 | Previous meeting]] |
− | |||
− | |||
− | |||
#: | #: | ||
# Announcements: | # Announcements: | ||
Line 46: | Line 43: | ||
## [https://excalidraw.com/#room=66f0f7fbc2ca25f638bf,aYAB22Gl-Je5rngECJBLJQ Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting] | ## [https://excalidraw.com/#room=66f0f7fbc2ca25f638bf,aYAB22Gl-Je5rngECJBLJQ Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting] | ||
### Week of 6/11: '''Derek out through 6/21''' | ### Week of 6/11: '''Derek out through 6/21''' | ||
− | ### Local Installation of ESnet CP - '''in progress''' - 'RUN go mod download && go mod verify' - proxy.golang.org/github/... tls: failed to verify cert x509 | + | ### Local Installation of ESnet CP - '''in progress''' - 'RUN go mod download && go mod verify' - [https://stackoverflow.com/questions/64462922/docker-multi-stage-build-go-image-x509-certificate-signed-by-unknown-authorit proxy.golang.org/github/... tls: failed to verify cert x509] |
## Data Sink: | ## Data Sink: | ||
### Perlmutter | ### Perlmutter |
Latest revision as of 18:08, 21 June 2023
The meeting time is 11:00am Eastern/USA.
Connection Info:
You can connect using [ https://jlab-org.zoomgov.com/j/1611828967?pwd=UVVCS0pUVW5FMlphT0lRQXdoQ0o4Zz09&from=addon ZoomGov Video conferencing (ID: 161 012 5238)]. (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1611828967 Meeting ID 161 182 8967 Passcode 570041 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Announcements:
- Lab Closed 06/19/2023
Computer center power outage 06/20/2023Rescheduled
- NERSC Test Development:
- Data Source:
- JLAB, CLAS12, pre-triggered events - 1 channel
- Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
- Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting
- Week of 6/11: Derek out through 6/21
- Local Installation of ESnet CP - in progress - 'RUN go mod download && go mod verify' - proxy.golang.org/github/... tls: failed to verify cert x509
- Data Sink:
- Perlmutter
- ERSAP
- Networking for Test
L3VPN Design with ESNetVet the cybersecurity controls with the security group.Implement Local network configuration changes/cybersecurity controls- Configure L3VPN, establish peering next
- Relocate to HACS-4 - soon
- Configure hosts to use tunnel, confirm traffic flow is as expected - last
- JLab Preliminary NERSC Test
- Test Plans - JLab, ESnet, NERSC:
- Data Source:
- Hall B CLAS12 detector streaming test
- Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
- Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP
- We have only one fiber between hallb counting room and counting house second floor available right now, will order more fibers installation, may take several months
- There are several available fibers between counting house second floor and computer center (like 6), we can use a couple of them for our test
- Summary: sometime in October, we should have 48 10GBit links from 24 VTPs connected to the switch in hallb counting room, with that switch connected to computer center by 2x100GBit links
- RT2022 Paper: Submission Process Complete
- ACAT2022 Paper: - submitted
- CHEP 2023 Conference Publication - in progress
- Simulation
- Demo Ready EJFAT Instance
- EJFAT Operational Status Board -> Prometheus Reporting
- Resources:
- AOT