Difference between revisions of "EPSCI SRO Meeting Jun. 26 2023"

From epsciwiki
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 39: Line 39:
 
## [https://indico.jlab.org/event/459/contributions/11397/ CHEP23 ERSAP presentation]
 
## [https://indico.jlab.org/event/459/contributions/11397/ CHEP23 ERSAP presentation]
 
## Deadline for the paper is in September
 
## Deadline for the paper is in September
 +
## Considering a modification of the meeting's starting time.
 
# GEM detector streaming readout
 
# GEM detector streaming readout
 
## Allocate some time to testing and optimizing stream mining actors within the ERSAP framework.
 
## Allocate some time to testing and optimizing stream mining actors within the ERSAP framework.
Line 46: Line 47:
 
## Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale
 
## Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale
 
## Develop ERSAP actors for the CLAS12 trigger.
 
## Develop ERSAP actors for the CLAS12 trigger.
**# Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test**
+
# <strong>Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test</strong>
 +
## Docker image
 
## Local pilot test
 
## Local pilot test
 
### Verify the functionality and performance of the EJFAT transport system
 
### Verify the functionality and performance of the EJFAT transport system

Latest revision as of 17:29, 26 June 2023


Connection Info:

You can connect using https://jlab-org.zoomgov.com/j/1608556097 (Meeting ID: 1160 855 6097). (Click "Expand" to the right for details -->):


Agenda:

  1. Announcements
    1. CHEP23 ERSAP presentation
    2. Deadline for the paper is in September
    3. Considering a modification of the meeting's starting time.
  2. GEM detector streaming readout
    1. Allocate some time to testing and optimizing stream mining actors within the ERSAP framework.
    2. @ToDo: GBT link level parallelization
      1. Parallelize GBT link five subgroups
  3. CLAS12 streaming readout
    1. Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale
    2. Develop ERSAP actors for the CLAS12 trigger.
  4. Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test
    1. Docker image
    2. Local pilot test
      1. Verify the functionality and performance of the EJFAT transport system
      2. Optimize stream processing back-end in terms of performance and hardware utilization
  5. ERSAP Roadmap
    1. ERSAP v2.0
  6. AOT

Useful References


Minutes: