Difference between revisions of "EPSCI SRO Meeting Jun. 26 2023"
Jump to navigation
Jump to search
(4 intermediate revisions by the same user not shown) | |||
Line 39: | Line 39: | ||
## [https://indico.jlab.org/event/459/contributions/11397/ CHEP23 ERSAP presentation] | ## [https://indico.jlab.org/event/459/contributions/11397/ CHEP23 ERSAP presentation] | ||
## Deadline for the paper is in September | ## Deadline for the paper is in September | ||
+ | ## Considering a modification of the meeting's starting time. | ||
# GEM detector streaming readout | # GEM detector streaming readout | ||
## Allocate some time to testing and optimizing stream mining actors within the ERSAP framework. | ## Allocate some time to testing and optimizing stream mining actors within the ERSAP framework. | ||
Line 46: | Line 47: | ||
## Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale | ## Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale | ||
## Develop ERSAP actors for the CLAS12 trigger. | ## Develop ERSAP actors for the CLAS12 trigger. | ||
− | + | # <strong>Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test</strong> | |
+ | ## Docker image | ||
## Local pilot test | ## Local pilot test | ||
### Verify the functionality and performance of the EJFAT transport system | ### Verify the functionality and performance of the EJFAT transport system |
Latest revision as of 17:29, 26 June 2023
Connection Info:
Expand
You can connect using https://jlab-org.zoomgov.com/j/1608556097 (Meeting ID: 1160 855 6097). (Click "Expand" to the right for details -->):
Agenda:
- Announcements
- CHEP23 ERSAP presentation
- Deadline for the paper is in September
- Considering a modification of the meeting's starting time.
- GEM detector streaming readout
- Allocate some time to testing and optimizing stream mining actors within the ERSAP framework.
- @ToDo: GBT link level parallelization
- Parallelize GBT link five subgroups
- CLAS12 streaming readout
- Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale
- Develop ERSAP actors for the CLAS12 trigger.
- Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test
- Docker image
- Local pilot test
- Verify the functionality and performance of the EJFAT transport system
- Optimize stream processing back-end in terms of performance and hardware utilization
- ERSAP Roadmap
- AOT
Useful References
- SRO Meetings
- CLAS12 SRO page
- ERSAP Document
- Vardan's WMS draft
- Graham's Paper describing SRO
- Dave Abbott's slides on data format