Difference between revisions of "EPSCI Group Meeting Nov. 16, 2020"
Jump to navigation
Jump to search
(Created page with " The meeting time is 10:00am. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://bluejeans.com/253300597 BlueJeans V...") |
|||
(6 intermediate revisions by 2 users not shown) | |||
Line 30: | Line 30: | ||
<!--------------------------------------------------------------------------------------------------> | <!--------------------------------------------------------------------------------------------------> | ||
=== Agenda: === | === Agenda: === | ||
− | # | + | # [[EPSCI Group Meeting Nov. 9, 2020 | Previous meeting]] |
# Announcements | # Announcements | ||
#* [https://careers.peopleclick.com/careerscp/client_jeffersonlab/external/jobDetails.do?functionName=getJobDetail&jobPostId=1665&localeCode=en-us Streaming Data Scientist position] | #* [https://careers.peopleclick.com/careerscp/client_jeffersonlab/external/jobDetails.do?functionName=getJobDetail&jobPostId=1665&localeCode=en-us Streaming Data Scientist position] | ||
− | #* SRO Workshop VII ([https://bnl.zoomgov.com/ | + | #* SRO Workshop VII ([https://bnl.zoomgov.com/j/1603257749?pwd=eXJyQUNweVBIcEVBdGx4NFlvV2E1Zz09 zoom]),([https://www.bnl.gov/srvii2020/ homepage]) ([https://indico.bnl.gov/event/9458/ indico]) |
#* SRO meeting cancelled this afternoon due to workshop | #* SRO meeting cancelled this afternoon due to workshop | ||
+ | #* [[Fortnight Papers|Fortnight paper]] for Mon. 11/23: | ||
+ | #*: [https://www.sciencedirect.com/science/article/pii/S0010465520303155 Development of FPGA based phase alignment logic for the high speed protocol in HEP Experiments] | ||
# Ongoing Activities | # Ongoing Activities | ||
#* JLab Common Environment (CE) + SPACK (Thomas, Nathan) | #* JLab Common Environment (CE) + SPACK (Thomas, Nathan) | ||
Line 47: | Line 49: | ||
#** Experimental Controls (David) | #** Experimental Controls (David) | ||
#* CODA/DAQ Software Support | #* CODA/DAQ Software Support | ||
+ | #* CLARA Support | ||
#* SRO (Vardan) | #* SRO (Vardan) | ||
#** Hall-B/D TriDAS | #** Hall-B/D TriDAS | ||
Line 64: | Line 67: | ||
=== Minutes: === | === Minutes: === | ||
− | + | Attendees: David L., Carl T., Nathan B., Kishan R., Vardan G., Thomas B. | |
− | '' | + | '''Previous Meeting''' |
+ | * SoLID | ||
+ | ** Carl reached out to Zhiwen who responded that they would be having a simulation meeting, but no general software meeting. No other info given. | ||
+ | ** DAQ system for SoLID will be different than others at JLab and will likely require our input. Carl will look into who is designing that. | ||
+ | |||
+ | '''Announcements''' | ||
+ | * Streaming Readout Workshop VII is happening this week. EPSCI SRO meeting for this afternoon cancelled | ||
+ | |||
+ | '''SPACK''' | ||
+ | * Nathan contacted Thomas, but not much movement yet | ||
+ | * David will see about helping. | ||
+ | |||
+ | '''EVIO-6''' | ||
+ | * Difficult part of documentation is done. | ||
+ | * Dave A. requested C-API be maintained as is. | ||
+ | ** Carl will look at this and make sure documentation and source is updated where needed. Not expected to be a significant amount of work. | ||
+ | |||
+ | '''JANA2''' | ||
+ | * GlueX Port progressing. Some issues with factory calls that seem to be unresolved, causing stop conditions. Working trough them. | ||
+ | * ACTS + EIC | ||
+ | ** Met with EIC group last week and Nathan updated on current work. | ||
+ | ** Path is clear on what is needed next. | ||
+ | ** Agreed to meet again in ~3 weeks | ||
+ | |||
+ | '''AI''' | ||
+ | * Kishan posted another page on SciComp to describe installing custom kernels for Jupyter. Still a few things to finalize, but mostly there. | ||
+ | ** Some new updates posted to JLab AI pages for review (David needs to approve) | ||
+ | * Hydra | ||
+ | ** Code jam week before last successful | ||
+ | ** The major refactoring of the hydra code is largely done and the system was running | ||
+ | ** Some issue with web page updating, but not considered a major problem and should be easily fixed | ||
+ | * Experimental Controls: Two positions entered into Peoplefluent but have not yet been approved | ||
+ | |||
+ | '''CLARA Support''' | ||
+ | * Some confusion on how conflicts with parameter names in global and local levels are handled. Some options discussed with Hall-B and it was decided the priorities in the existing code should be left. | ||
+ | |||
+ | '''SRO''' | ||
+ | * Indra lab test setup | ||
+ | ** Ben R. and Dave A. solved issue with Indra test setup where no hits were being seen in Vardan's testing the previous week | ||
+ | ** Currently VTP test setup provides 300MByte/sec/link data rate. | ||
+ | ** Able to get 1% deadtime fairly quickly with multiple threads. For 600MByte/sec aggregated (2 VTP streams) stream processing 2.5 cores are used for aggregation and 4 cores are used for hit finder. | ||
+ | ** 1% dead time that was also present during the beam test was due to the disruptor ring-buffer tuning. Problem solved, but expected to be optimized again for the large data volumes (will see). in coming week/s an additional splitter will be installed to provide ~900MByte/s/link. | ||
+ | ** Aggregate rate of ~600MB/s with no loss of the VTP frames was achieved. | ||
+ | * TriDAS | ||
+ | ** Sergey B. presented estimation of data rates at HAll-B SRO meeting last week. | ||
+ | ** Suggested the current design spec should be for 5GB/s streams with the ability to scale to multiple 5GB/s streams | ||
+ | |||
+ | '''Offsite''' | ||
+ | * Production running still at NERSC, PSC, IU. Documentation still needed for new NERSC and IU workflows so it can be handed over to Hall-D postdoc | ||
+ | * OSG sent first jobs into JLab | ||
+ | ** Jobs started but had issues running | ||
+ | ** May well have fully running jobs by end of week (depends on vacation schedule of key OSG personnel) | ||
+ | |||
+ | '''Publications''' | ||
+ | * Everyone was encouraged to add their most recent publications (including proceedings) to the EPSCI publications page so we can fill in the blank section of the home page. |
Latest revision as of 19:06, 16 November 2020
The meeting time is 10:00am.
Connection Info:
You can connect using BlueJeans Video conferencing (ID: 253 300 597). (Click "Expand" to the right for details -->):
Meeting URL https://bluejeans.com/253300597?src=join_info Meeting ID 253 300 597 Want to dial in from a phone? Dial one of the following numbers: +1.888.240.2560 (US Toll Free) (see all numbers - https://www.bluejeans.com/premium-numbers) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Announcements
- Streaming Data Scientist position
- SRO Workshop VII (zoom),(homepage) (indico)
- SRO meeting cancelled this afternoon due to workshop
- Fortnight paper for Mon. 11/23:
- Ongoing Activities
- JLab Common Environment (CE) + SPACK (Thomas, Nathan)
- EVIO-6 (Carl)
- JANA2 (Nathan)
- GlueX port
- ACTS + EIC
- A.I.
- JLab AI webpage (Kishan)
- Hydra (Kishan/Thomas)
- A.I.I.
- Experimental Controls (David)
- CODA/DAQ Software Support
- CLARA Support
- SRO (Vardan)
- Hall-B/D TriDAS
- ERSAP
- Offsite Computing
- BigRed3 at IU (David)
- NERSC (David)
- OSG (Thomas)
- GUI for Calorimeter calibration scripts (Hall-D Request) (Thomas)
- Publications
- AOT
Minutes:
Attendees: David L., Carl T., Nathan B., Kishan R., Vardan G., Thomas B.
Previous Meeting
- SoLID
- Carl reached out to Zhiwen who responded that they would be having a simulation meeting, but no general software meeting. No other info given.
- DAQ system for SoLID will be different than others at JLab and will likely require our input. Carl will look into who is designing that.
Announcements
- Streaming Readout Workshop VII is happening this week. EPSCI SRO meeting for this afternoon cancelled
SPACK
- Nathan contacted Thomas, but not much movement yet
- David will see about helping.
EVIO-6
- Difficult part of documentation is done.
- Dave A. requested C-API be maintained as is.
- Carl will look at this and make sure documentation and source is updated where needed. Not expected to be a significant amount of work.
JANA2
- GlueX Port progressing. Some issues with factory calls that seem to be unresolved, causing stop conditions. Working trough them.
- ACTS + EIC
- Met with EIC group last week and Nathan updated on current work.
- Path is clear on what is needed next.
- Agreed to meet again in ~3 weeks
AI
- Kishan posted another page on SciComp to describe installing custom kernels for Jupyter. Still a few things to finalize, but mostly there.
- Some new updates posted to JLab AI pages for review (David needs to approve)
- Hydra
- Code jam week before last successful
- The major refactoring of the hydra code is largely done and the system was running
- Some issue with web page updating, but not considered a major problem and should be easily fixed
- Experimental Controls: Two positions entered into Peoplefluent but have not yet been approved
CLARA Support
- Some confusion on how conflicts with parameter names in global and local levels are handled. Some options discussed with Hall-B and it was decided the priorities in the existing code should be left.
SRO
- Indra lab test setup
- Ben R. and Dave A. solved issue with Indra test setup where no hits were being seen in Vardan's testing the previous week
- Currently VTP test setup provides 300MByte/sec/link data rate.
- Able to get 1% deadtime fairly quickly with multiple threads. For 600MByte/sec aggregated (2 VTP streams) stream processing 2.5 cores are used for aggregation and 4 cores are used for hit finder.
- 1% dead time that was also present during the beam test was due to the disruptor ring-buffer tuning. Problem solved, but expected to be optimized again for the large data volumes (will see). in coming week/s an additional splitter will be installed to provide ~900MByte/s/link.
- Aggregate rate of ~600MB/s with no loss of the VTP frames was achieved.
- TriDAS
- Sergey B. presented estimation of data rates at HAll-B SRO meeting last week.
- Suggested the current design spec should be for 5GB/s streams with the ability to scale to multiple 5GB/s streams
Offsite
- Production running still at NERSC, PSC, IU. Documentation still needed for new NERSC and IU workflows so it can be handed over to Hall-D postdoc
- OSG sent first jobs into JLab
- Jobs started but had issues running
- May well have fully running jobs by end of week (depends on vacation schedule of key OSG personnel)
Publications
- Everyone was encouraged to add their most recent publications (including proceedings) to the EPSCI publications page so we can fill in the blank section of the home page.