Difference between revisions of "GlueX 2023"

From epsciwiki
Jump to navigation Jump to search
Line 29: Line 29:
 
</pre>
 
</pre>
  
Feb 16 RoboCDC started?
+
Feb 16 RoboCDC started
 +
 
 +
Feb 20 10am RoboCDC switched off because MCC are doing a BCM recalibration, the desired beam current will probably change, Naomi prefers to see what current we get after the recalibration before switching the AI back on, in case of surprises.

Revision as of 16:07, 20 February 2023

EPICS overview - change the dates to suit

Same, with temperature

DAQ status in EPICS

HV scan instructions

RC meeting page

Shift leader instructions & desperate logbook entry on prestarts


wish list Remaining items are EPICS gathering (Thomas) & move to Prestart (David in Jan, or ask Sergey)


The default GCF in CCDB for runs 120,000+ is 0.1491. This is good. Summer 2020 runs 72075 and 72766 started at close to 350nA and w pressure close to (and on either side of) 100kPa, have GCFs 0.148 and 0.150.


Run starts Jan 12

Naomi out Jan 3-23

Initialization?

source $HOSS_VENV/bin/activate.csh
python3 /group/halld/AIEC/AIEC_CDC.py -c /group/halld/AIEC/AIEC_CDC.cfg -I 15

Feb 16 RoboCDC started

Feb 20 10am RoboCDC switched off because MCC are doing a BCM recalibration, the desired beam current will probably change, Naomi prefers to see what current we get after the recalibration before switching the AI back on, in case of surprises.