Difference between revisions of "EJFAT Group Meeting May. 5, 2022"
Jump to navigation
Jump to search
Line 64: | Line 64: | ||
**** CODA 3.10 + ERSAP for new VTP f/w | **** CODA 3.10 + ERSAP for new VTP f/w | ||
**** CODA 2.0 for old VTP f/w | **** CODA 2.0 for old VTP f/w | ||
+ | **** [https://docs.google.com/presentation/d/1m3rFm-1GymYv8zGimlAjL1NmWtXVfyIQdGzhx_j_BKE/edit?usp=sharing Diagram] | ||
*** [https://www.epj-conferences.org/articles/epjconf/abs/2021/05/epjconf_chep2021_04005/epjconf_chep2021_04005.html HOSS Hall-D EJFAT use case] | *** [https://www.epj-conferences.org/articles/epjconf/abs/2021/05/epjconf_chep2021_04005/epjconf_chep2021_04005.html HOSS Hall-D EJFAT use case] | ||
**** parallelize writing of raw data files | **** parallelize writing of raw data files |
Revision as of 13:23, 5 May 2022
The meeting time is 11:00am.
Connection Info:
You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon Meeting ID 161 012 5238 Passcode 503371 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Situation:
- Rec'd new f/w build 28 April
- Specs
- Restores Jumbo Frames
- arp, ping - working
- Port entropy field - Passed Test for data_id stream horizontal reassembly with 10 streams
- Using script based LB Control Plane
- ERSAP feed end bottleneck needs investigation; Timmer's blaster may provide relief
- EJFAT subnet VLAN 937 172.19.22.0/24
- EJFAT equip inventory:
- Loaners:
- (2) switches: ejfat-sw, daq-cc-f109-sw-1
- (3) DAQ dev machines indra-s[1-3]
- (4) DAQ Farm machines dafarm61 dafarm62 dafarm63 dafarm64 currently on 129.57.29.0/24 subnet w/ additional i/f available for EJFAT subnet
- (17) Hall-D machines - gluon120-36
- 10Gbs NICs
- On Order:
- Compute Equip.- ETA 1 June - sans 100Gbs NICs (ETA 1 July)
- Networking Equip. - ETA
1 July5 October
- Loaners:
- Rec'd new f/w build 28 April
- Pending:
- Support C libraries for LB Host Control Plane - immenent
- ESnet smartnic open-source GitHub repo (May)
- ESnet private, forkable Jlab P4 and simulations GitHub repo (May)
- To Do:
- Near Term:
- Hall-B FT calorimeter and hodoscope streaming readout test - Pending OK from Sergey B.
- May be able to use Abbott's indra-s1 setup
- May be able to use new VTP f/w with Hall-B VTP's - (Ben Raydo)
- CODA 3.10 + ERSAP for new VTP f/w
- CODA 2.0 for old VTP f/w
- Diagram
- HOSS Hall-D EJFAT use case
- parallelize writing of raw data files
- distribute raw data across multiple compute nodes for calibration skims
- 1 Gbs at hi-luminosity
- Control Plane
- Will interact with SLURM
- Python based (?)
- Control Plane daemon for compute host (?)
- Demonstrate CP based flexibility/elasticity
- Hall-D comms with DAQ 109 subnet require network customization; DAQ 29 subnet available
- Slides
- Netwok Diagram
- Hall-B FT calorimeter and hodoscope streaming readout test - Pending OK from Sergey B.
- Downstream:
- DPDK
- IPV6 testing
- RT2022 - August 01-05 Conference
- Near Term:
- AOT