Difference between revisions of "GlueX 2023"

From epsciwiki
Jump to navigation Jump to search
Line 31: Line 31:
 
Feb 16 RoboCDC control started
 
Feb 16 RoboCDC control started
  
Feb 20 10am RoboCDC control switched off because MCC are doing a BCM recalibration, the desired beam current will probably change, Naomi prefers to see what current we get after the recalibration before switching the AI back on, in case of surprises.
+
Feb 20 10am - 3pm RoboCDC control switched off during MCC's BCM recalibration (which was found to be unnecessary)

Revision as of 20:06, 20 February 2023

EPICS overview - change the dates to suit

Same, with temperature

DAQ status in EPICS

HV scan instructions

RC meeting page

Shift leader instructions & desperate logbook entry on prestarts


wish list Remaining items are EPICS gathering (Thomas) & move to Prestart (David in Jan, or ask Sergey)


The default GCF in CCDB for runs 120,000+ is 0.1491. This is good. Summer 2020 runs 72075 and 72766 started at close to 350nA and w pressure close to (and on either side of) 100kPa, have GCFs 0.148 and 0.150.


Run starts Jan 12

Naomi out Jan 3-23

Initialization?

source $HOSS_VENV/bin/activate.csh
python3 /group/halld/AIEC/AIEC_CDC.py -c /group/halld/AIEC/AIEC_CDC.cfg -I 15

Feb 16 RoboCDC control started

Feb 20 10am - 3pm RoboCDC control switched off during MCC's BCM recalibration (which was found to be unnecessary)