Difference between revisions of "EJFAT EPSCI Meeting May. 3, 2023"

From epsciwiki
Jump to navigation Jump to search
(Created page with "The meeting time is 2:30pm. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://teams.microsoft.com/l/meetup-join/19%...")
 
 
Line 24: Line 24:
  
 
=== Agenda: ===
 
=== Agenda: ===
# [[EJFAT EPSCI Meeting Apr. 27, 2023 | Previous meeting]]
+
# [[EJFAT EPSCI Meeting Apr. 26, 2023 | Previous meeting]]
 
#:
 
#:
 
# Announcements:
 
# Announcements:

Latest revision as of 14:47, 24 May 2023

The meeting time is 2:30pm.

Connection Info:


Agenda:

  1. Previous meeting
  2. Announcements:
    1. - CHEP 2023 - Week of May 8
  3. NERSC Test Development:
    1. Data Source:
      1. JLAB, CLAS12, pre-triggered events - 1 channel
      2. Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
    2. Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting - ETA + 2 weeks?
      1. Week of 2/13:
        1. Finish mock API server
        2. Create an internal representation of the load balancer calendar
        3. Implement the algorithm specified in "EJFAT Load Balancer Schedule Density from Reassembly Engine PID control"
      2. Week of 2/20: Other ESnet projects
      3. Week of 2/27: Add integration for the SmartNIC P4 Controller, synchronizing the internal state of the gRPC server with the P4 tables.
      4. Week of 3/6: Other ESnet projects
      5. Week of 3/13: Start work on integration test tooling.
      6. Week of 3/20: Other ESnet projects
      7. Week of 3/27: CP Development
      8. Week of 4/02: Other ESnet projects
      9. Week of 4/07: Integration Testing
      10. Week of 4/16: Other ESnet projects
      11. Week of 4/23: CP Development
      12. Week of 4/30: Other ESnet projects
      13. JLab to supply Event reception tools
    3. Data Sink:
      1. Perlmutter
      2. ERSAP
    4. Networking for Test - ETA + 2 weeks?
      1. L3VPN Design with ESNet (done)
      2. Configure L3VPN, establish peering (in progress)
      3. Vet the cybersecurity controls with the security group.  (in progress)
      4. Relocate to HACS-4
      5. Configure hosts to use tunnel, confirm traffic flow is as expected
      6. Implement Local network configuration changes/cybersecurity controls
    5. Test Plans - JLab, ESnet, NERSC:
  4. RT2022 Paper: Submission Process Complete
  5. ACAT2022 Paper: - submitted
  6. PID Simulation Results/Algorithms may bear fruit for NERSC Test
  7. Demo Ready EJFAT Instance
  8. EJFAT Operational Status Board -> Prometheus Reporting
  9. Hall B CLAS12 FT detector streaming test
  10. Resources:
    1. HPDF
  11. AOT