Difference between revisions of "EPSCI SRO Meeting Jun. 26 2023"

From epsciwiki
Jump to navigation Jump to search
Line 46: Line 46:
 
## Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale
 
## Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale
 
## Develop ERSAP actors for the CLAS12 trigger.
 
## Develop ERSAP actors for the CLAS12 trigger.
**# Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test**  
+
**Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test**  
 
## Local pilot test
 
## Local pilot test
 
### Verify the functionality and performance of the EJFAT transport system
 
### Verify the functionality and performance of the EJFAT transport system

Revision as of 15:29, 26 June 2023


Connection Info:

You can connect using https://jlab-org.zoomgov.com/j/1608556097 (Meeting ID: 1160 855 6097). (Click "Expand" to the right for details -->):

One tap mobile: US: +16692545252,,1618740469# or +16468287666,,1618740469#
Meeting URL: https://jlab-org.zoomgov.com/j/1608556097?pwd=S1Fzbk9ubnZsOW5pRStqWW5MVTZLZz09&from=addon
Meeting ID: 160 855 6097
Passcode: 923910

Join by Telephone
For higher quality, dial a number based on your current location.
Dial:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)
Meeting ID: 160 855 6097

International numbers
Join from an H.323/SIP room system
H.323: 161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 160 855 6097
Passcode: 923910
SIP: 1608556097@sip.zoomgov.com
Passcode: 923910


Agenda:

  1. Announcements
    1. CHEP23 ERSAP presentation
    2. Deadline for the paper is in September
  2. GEM detector streaming readout
    1. Allocate some time to testing and optimizing stream mining actors within the ERSAP framework.
    2. @ToDo: GBT link level parallelization
      1. Parallelize GBT link five subgroups
  3. CLAS12 streaming readout
    1. Preliminary discussions with the CLAS12 off-line in preparation for the tests in October time scale
    2. Develop ERSAP actors for the CLAS12 trigger.
    • Preparation for the JIRAF-EJFAT-EsNet-NERSC integration test**
    1. Local pilot test
      1. Verify the functionality and performance of the EJFAT transport system
      2. Optimize stream processing back-end in terms of performance and hardware utilization
  1. ERSAP Roadmap
    1. ERSAP v2.0
  2. AOT

Useful References


Minutes: