Difference between revisions of "EJFAT EPSCI Meeting Jul. 5, 2023"
Jump to navigation
Jump to search
(Created page with "The meeting time is 2:30pm. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://teams.microsoft.com/l/meetup-join/19%...") |
|||
Line 39: | Line 39: | ||
### Perlmutter | ### Perlmutter | ||
### ERSAP | ### ERSAP | ||
+ | ### [https://jeffersonlab-my.sharepoint.com/personal/goodrich_jlab_org/_layouts/15/Doc.aspx?sourcedoc={0c756ef1-3aae-4b27-b637-d6f7c29262c9}&action=edit&wd=target%28Untitled%20Section.one%7C15a752ac-38b3-4463-9133-421e9b9e382f%2F%5BEXTERNAL%5D%20EJFAT%20Control%20Plane%20Update%7Ce1afc000-80fa-49ea-9255-a1e4720dbbcc%2F%29&wdorigin=NavigationUrl '''Derek's Requests for More Simulation Support for CP'''] | ||
## Networking for Test | ## Networking for Test | ||
### <s>L3VPN Design with ESNet </s> | ### <s>L3VPN Design with ESNet </s> |
Latest revision as of 18:09, 5 July 2023
The meeting time is 2:30pm.
Connection Info:
You can connect using Teams Link. (Click "Expand" to the right for details -->):
Agenda:
- Previous meeting
- Announcements:
Computer center power outage 06/20/2023Rescheduled- The networking is in place to allow the EJFAT servers to be moved from HACS 3 (where they are now) to HACS 4 (the testbed cabinets). Because the servers are currently n production racks, we will need a CDCList entry to be approved before we move them. I propose that Austin take the lead on the CDCList entry with support from Dave and me for the THA. Once it is approved we pick a day for Mike to come in and do the move-- likely next week at the earliest. We will need some networking support for it for BMC, etc.
- NERSC Test Development:
- Data Source:
- JLAB, CLAS12, pre-triggered events - 1 channel
- Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
- Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting
- Week of 7/02: CP Development
- Local Installation of ESnet CP - in progress
- Data Sink:
- Perlmutter
- ERSAP
- Derek's Requests for More Simulation Support for CP
- Networking for Test
L3VPN Design with ESNetVet the cybersecurity controls with the security group.Implement Local network configuration changes/cybersecurity controlsConfigure L3VPN, establish peering next- Relocate to HACS-4 - soon
- Configure hosts to use tunnel, confirm traffic flow is as expected - last
- JLab Preliminary NERSC Test - Vardan's Metrics/Horizontal Scaling
- Test Plans - JLab, ESnet, NERSC:
- Data Source:
- Hall B CLAS12 detector streaming test
- Switch 7050 is expected to arrive some time around October; we have already transceivers, short cables and patch panel to connect up to 32 VTPs to it using two 10GBit links per VTP
- Fiber installation between hallb forward carriage and hallb counting room should be done this summer, will be enough for 24 VTPs using two 10GBit links per VTP
- We have only one fiber between hallb counting room and counting house second floor available right now, will order more fibers installation, may take several months
- There are several available fibers between counting house second floor and computer center (like 6), we can use a couple of them for our test
- Summary: sometime in October, we should have 48 10GBit links from 24 VTPs connected to the switch in hallb counting room, with that switch connected to computer center by 2x100GBit links
- RT2022 Paper: Submission Process Complete
- ACAT2022 Paper: - submitted
- CHEP 2023 Conference Publication - in progress - deadline September 8, 2023
- Simulation
- Demo Ready EJFAT Instance
- EJFAT Operational Status Board -> Prometheus Reporting
- Resources:
- AOT