Difference between revisions of "EPSCI Group Meeting May 3, 2021"
Jump to navigation
Jump to search
Line 114: | Line 114: | ||
* SRO | * SRO | ||
** Ed sent Vardan detailed instructions how to operate the SAMPA setup. | ** Ed sent Vardan detailed instructions how to operate the SAMPA setup. | ||
− | ** Vardan was able to start the readout and record data from 5 front-end cards in 10 separate files (2 stream per card) | + | ** Vardan was able to start the readout and record data from 5 front-end cards in 10 separate files (2 stream per card). |
** Carl and Vardan are continuing to work on VTP and SAMPA setups in the indra-lab. | ** Carl and Vardan are continuing to work on VTP and SAMPA setups in the indra-lab. | ||
* CODA | * CODA |
Revision as of 20:20, 3 May 2021
The meeting time is 10:00am.
Connection Info:
You can connect using BlueJeans Video conferencing (ID: 253 300 597). (Click "Expand" to the right for details -->):
Meeting URL https://bluejeans.com/253300597?src=join_info Meeting ID 253 300 597 Want to dial in from a phone? Dial one of the following numbers: +1.888.240.2560 (US Toll Free) (see all numbers - https://www.bluejeans.com/premium-numbers) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Announcements
- Fortnight paper for May 10: TBD
- Conferences and Workshops
- vCHEP2021 (May 17-21)
- Thomas, Kishan: Hydra
- Vardan, Nathan, David (+Hall-B, Fast Electronics, and TriDAS groups): TriDAS + JANA2 SRO
- David: HOSS!
- PyHEP 2021 (July 5-9)
- ACAT2021 (Nov. 29 - Dec. 3)
- vCHEP2021 (May 17-21)
- Ongoing Activities
- Scientific Software support
- JLab Common Environment (CE) + SPACK
- ServiceNow (mapmanager, fputil, fpack, bos, bankdef)
- EIC
- David Co-convener of Computing Team for ECCE
- Offline frameworks (CLARA, JANA2)
- JLab Common Environment (CE) + SPACK
- EJFAT (ESnet/JLab + FPGA +Accelerated Transport)
- Status of proposal
- DAQ systems
- SRO
- SAMPA + ERSAP + JANA2 + INDRA-ASTRA = ?
- CODA (CODA3 support, EVIO-6)
- SRO
- A.I.
- Experimental Controls
- AIMCEG
- Multiple FOAs + JLab LDRD
- Collaboration with Theory on MCGen project DE-FOA-0002493 - preproposal submitted
- Collaboration with BNL on AI scheduling DE-FOA-0002482
- Collaboration with INDRA-ASTRA - ?
- Collaboration with Sergey F. on AI + FPGA - deferred awaiting roadmap
- Surrogate Models proposal (LDRD) - preproposal submitted
- Amplitude Analysis Inverse Problem (LDRD) - preproposal submitted
- Offsite Computing
- OSG
- NERSC, PSC, IU
- Scientific Software support
- AOT
Minutes:
Attendees: Nathan B., Kishan R., Vardan G., Thomas B., Mike G., Torri J., Carl T.
- Announcements
- Fortnight paper: There was a suggestion that EPSCI group every focus group (AI, SRO, FPGA based data transfer, etc.) will come up with a paper that would benefit their research.
- Summer internship program: 5 high school students will be working with our group during the June-July time frame.
- Workshop and conferences
- 3 accepted papers at VCHEP2021
- TriDAS group will provide a presenter for the talk on TriDAS+JANA2 paper.
- CI + SPACK
- Summer intern (Jillian) will work on the JLAB common environment.
- EIC
- Graham informed on a new working group formation at the EIC, including David Lawrence, Christiano, and Dmitry Romanov.
- Thomas reported that EIC will be able to submit jobs on OSG through newly created EIC sub VO on the JLAB OSG dedicated resources.
- Brayan is going to increase fair share for the EIC VO, effectively treating EIC as a the 5th experimental Hall.
- JANA2
- Nathan continues working on JANA2 GlueX port, and reported a sizable progress achieved last week.
- CLARA
- v5.0.1 release is not officially deployed as a production version in CLAS12, so nothing to report.
- EJFAT
- ESnet whitebox design is available for review. The design includes an option for a switch based load balancing.
- ESnet suggest using hardware switches equipped with the LAB protocol, where multiple links between two switches combine to provide higher bandwidth links between them.
- PR is being prepared for the FPGA.
- FPGA from the ESnet will be available for tests mid July.
- Funding opportunities
- Graham is leading multiple efforts to establish collaborations and projects with real funding opportunities, including an official collaboration with ESnet, ASCR funded 3 phase Data Reduction Pipeline project, and collaboration with BNL on AI model based workflows.
- SRO
- Ed sent Vardan detailed instructions how to operate the SAMPA setup.
- Vardan was able to start the readout and record data from 5 front-end cards in 10 separate files (2 stream per card).
- Carl and Vardan are continuing to work on VTP and SAMPA setups in the indra-lab.
- CODA
- Carl is finalizing the EVIO-6 release
- Vardan is working on JCEdit to implement FPGA based ROC, a new CODA component type.
- AI
- AI Experimental Controls
- Torri is leading discussions at the AI WG weekly meetings related to defining critical design requirements and conditions for the project.
- AICEG
- Kishan continues to work with Nabuo on the AICEG project. He is evaluating Nabuo’s proposal to use a Lambda layer in the model that will help to incorporate user defined augmented features.
- Hydra
- Kishan he is trying to use layer-wise relevance propagation method to identify important sections of the histogram image.
- Two summer interns will work on Hydra project this summer.
- AI Experimental Controls
- OSG
- Thomas reported that the new feature to bundle similar jobs in the mc-wrapper is chocking CONDOR when the number of bundled jobs in the queue is higher than certain amount (>2000 or so). An obvious solution to this problem, according to Thomas, would be to introduce a limit on the number of jobs in the queue.
- Two summer students/interns will work on mc-wrapper this summer.