JIRIAF Meeting Aug. 3 2023
Connection Info:
You can connect using https://jlab-org.zoomgov.com/j/1608518798 (Meeting ID: 160 851 8798). (Click "Expand" to the right for details -->):
One tap mobile: US: +16692545252,,1608518798# or +16468287666,,1608518798#
Meeting URL: https://jlab-org.zoomgov.com/j/1608518798?pwd=NnU3cW1ZZFhTTUQ2Y0hIRU5JTWg0UT09&from=addon
Meeting ID: 160 851 8798
Passcode: 205601
Join by Telephone
For higher quality, dial a number based on your current location.
Dial:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)
Meeting ID: 160 851 8798
International numbers
Join by SIP
1608518798@sip.zoomgov.com
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 160 851 8798
Passcode: 205601
Agenda:
- Announcements
- Welcome Jeng-Yuan Tsai on board!
- CHEP23
- CHEP23 publication is due in September
- Hardware
- jiriaf23-1/02 are moved to L3 VPN
- Installing ERSAP and JIRIAF
- Request to mount /daqfs
- JDK installation
- jdk1.8 and jdk17 on jiriaf2301
- sudo update-alternatives --config 'java' (to switch between versions)
- jdk1.8 and jdk17 on jiriaf2301
- Tiled is installed
- No word from Allan Daniel from BNL.
- JFE developments status
- Installed Node.js on jiriaf2301
- node: v10.24.0, and npm: 6.14.11
- Created demo web server using node
- node --inspect demo_server.js
- FE integration with the JIRAF DB
- When can we have the JIRIAF site up and running?
- Installed Node.js on jiriaf2301
- JIRIAF DB
- Installation on jiriaf2301
- DB basic tables
- Resources table, updated by the JRM
- Requests table, updated by the JFE
- JCS algorithm to match requests with resources
- JRM
- Conceptual design document
- JRM sketch
- Created a Dockerfile to create an image containing Ubuntu, Docker, and K8s components, such as kubelet and kubectl.
- Preparation for upcoming integration test at NERSC
- NERSC account and login
- Updates to the CLAS12 reconstruction ERSAP workflow
- New ET source actor (completed)
- New PID visualization actor (in progress)
- Tested local deployment on indra-s2 -> ejfat1,3,5,6.
- ERSAP workflow container, including EJFAT transport components (in progress)
- Project extension
- FY24 proposal is submitted
- Distributed workflow agent modeling
- Mathematical model for an abstract processing actor
- Presentation August 10
- FY24 proposal is submitted
- AOT
Useful References