Cosmics test plans

From epsciwiki
Revision as of 23:00, 6 December 2021 by Njarvis (talk | contribs) (Created page with "Objectives: * Test drive the AIEC software * Demonstrate that the CDC gain is stable Strategy: * Designate 2130V as the nominal HV for cosmics, to raise more hits above the...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Objectives:

  • Test drive the AIEC software
  • Demonstrate that the CDC gain is stable


Strategy:

  • Designate 2130V as the nominal HV for cosmics, to raise more hits above the noise, but keep 20V headroom for the AI.
  • Tell the AI that the HVB current is constant at 9uA so that it can operate within the range of its trained data
  • Use 1V steps and 1h runs


Needs:

  • AIEC software to read epics and wait for a stable period before calculating the gain and setting the HV
  • Method for scaling the HVB current to what it would be at the nominal HV before running the AI - will not be needed for cosmics but will be needed for CPP.
  • Script to project dE/dx for 4-10 GeV tracks, fit it and calculate the gain factor