EJFAT Group Meeting Mar. 3, 2022

From epsciwiki
Jump to navigation Jump to search

The meeting time is 11:00am.

Connection Info:

You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):

Meeting URL
 https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon

Meeting ID
161 012 5238

Passcode
503371

Want to dial in from a phone?

Dial one of the following numbers:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)

Enter the meeting ID and passcode followed by #

Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode

Agenda:

  • Previous meeting
  • Situation:
    • Testing with ERSAP on FPGA LB
    • Using script based LB Control Plane
    • Awaiting Compute Equip.- ETA 1 June
    • Awaiting Networking Equip. - ETA 1 July
    • End-to-end EJFAT ERSAP solution
    • Building Interim Test Lab
      • Use FPGA port #1 for local host subnet testing
      • Use FPGA port #2 for switch fabric testing
      • Use (2) spare/borrowed switches
      • Using spare 8 nodes (Abbott)
      • Using Hall-D spare 10Gbs NICs
      • Switch config for Jumbo frames
      • Diagram
  • Pending:
    • Minor f/w change for 'garbage' packets
    • Support C libraries for LB Host Control Plane
    • ESnet smartnic open-source GitHub repo (April)
    • ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
  • To Do:
    • Connect
      • FPGA port #2 to switch
      • Melanox NIC port #2 to switch
      • CentOS 7 install on interim boxes - next week
    • FPGA routing based on
      • Event-Id (Tick) + Data-Id (ROC-Id) ?
      • Multiple Destinations for Event-Id + Data-Id ?
    • C-based control plane
      • Feedback from Compute hosts design
      • Control Plane Arp cache / network good citizen
      • SLURM
    • Control Plane daemon for compute host
    • Jumbo Frames - currently limited to 1472B frames - fix is in / not yet installed
    • IPV6 testing
    • EJFAT Subnet
    • Stress Test with ERSAP
    • Performance Measures (RT2022 - April 01 submission):
      • Payload Size
      • Reassembly
      • Multiple Back-Ends
      • AOT
  • Test Plan
  • AOT