EJFAT EPSCI Meeting Apr. 6, 2022
Jump to navigation
Jump to search
The meeting time is 2:00pm.
Connection Info:
You can connect using ZoomGov Video conferencing (ID: 161 203 8101). (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1612038101?pwd=Yk96QUcyT1NDVTRRUGNtOFVSSTdaUT09&from=addon Meeting ID 161 203 8101 Passcode 378382 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Situation:
- Testing with End-to-end EJFAT ERSAP solution on FPGA LB
- Jumbo Frames - indra-s2,s3, alkaid, fpga
- Linux IP stack buffer size increased
- Using script based LB Control Plane
- Control Plane Gratuitous Arp cache updating (Scapy)
- Benchmarking
- Successfully Testing Calendar Epoch Advances
- RT2022 - April 08 submission - August Conference
- Pending:
- Compute Equip.- ETA 1 June
- Networking Equip. - ETA 1 July
- Support C libraries for LB Host Control Plane
- ESnet smartnic open-source GitHub repo (April)
- ESnet private, forkable Jlab P4 and simulations GitHub repo (April)
- Data_id <-> reassembly port mapping
- To Do:
- Near Term:
- Hall-B has an old version of the firmware, so VTP will send TCP (no UDP). Could intercept and resend UDP VTP streams (12 streams, if we get 3 crates) to how LB can handle 12 ID's and do effectively an aggregation.
- C-based control plane
- Feedback from Compute hosts design
- Control Plane daemon for compute host
- Downstream:
- DPDK
- P4 enhancements for ipv4/6 ping, arp
- IPV6 testing
- EJFAT Subnet
- HOSS Hall-D EJFAT use case
- parallelize writing of raw data files
- distribute raw data across multiple compute nodes for calibration skims
- Near Term:
- AOT