AIEC Wish list
Jump to navigation
Jump to search
- Make sure that the initialization is scaling the gcf to its mean pressure equivalent, if it is not doing that already. So far all the inits have been done at mean pressure or close to it.
- CDC - need to scale 2018 gains up (gcf down) by 6% & retrain.
- Look more closely to find what the correction should be. See if we can match beam current & radiator (ideally amo) & pressure.
- FDC - correlation between gcf & pressure was good for 2020, inconsistent for 2018. Torri needs to talk to Lubomir.