JIRIAF Meeting Jun. 7 2023

From epsciwiki
Revision as of 17:45, 8 June 2023 by Gurjyan (talk | contribs)
Jump to navigation Jump to search


Connection Info:

You can connect using https://jlab-org.zoomgov.com/j/1608518798 (Meeting ID: 160 851 8798). (Click "Expand" to the right for details -->):

One tap mobile: US: +16692545252,,1608518798# or +16468287666,,1608518798#
Meeting URL: https://jlab-org.zoomgov.com/j/1608518798?pwd=NnU3cW1ZZFhTTUQ2Y0hIRU5JTWg0UT09&from=addon
Meeting ID: 160 851 8798
Passcode: 205601

Join by Telephone
For higher quality, dial a number based on your current location.
Dial:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)
Meeting ID: 160 851 8798

International numbers
Join by SIP
1608518798@sip.zoomgov.com
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 160 851 8798
Passcode: 205601


Agenda:

  1. Previous Meeting
  2. Announcements
    1. CHEP23
      1. CHEP23 publication is due in July
    2. Hiring status
      1. On July 17 Jeng-Yuan Tsai will start working on the project
      2. Welcoming Zian Zhou (Daniel)
  3. Hardware
    1. jiriaf2301 and jiriaf2302
      1. Installed in the testbed
      2. Networking (L3 VPN)
      3. Do we need SLURM on these nodes?
      4. Installing ERSAP and JIRIAF (in progress)
      5. JDK installation.
      6. Tiled is installed
  4. JFE developments status
    1. Horio's code is available on jiriaf2301: /home/gurjyan/JIRIAF_FE
  5. JIRIAF DB
    1. Installation on jiriaf2301
    2. DB basic tables
      1. Resources table, updated by the JRM
      2. Requests table, updated by the JFE
      3. JCS algorithm to match requests with resources
  6. Preparation for upcoming integration test at NERSC
    1. NERSC account and login
      1. Updates to the CLAS12 reconstruction ERSAP workflow
        1. New ET source actor
        2. New PID visualization actor
        3. Working on local integration test.
      2. ERSAP workflow container, including EJFAT transport components
  7. Project extension
    1. FY24 proposal is due June 30th
      1. IRI digital twin
  8. SWIF2 history data processing
    1. Understanding patterns for job submissions and resource utilizations
  9. AOT

Useful References



Minutes: